Skip to content
High Speed Rail Authority

Invitation for Bids for Construction of Fresno Station Early Works

Solicitation: Not available
Notice ID: c6a121450115122727fc38875ddab148
DepartmentHigh Speed Rail AuthorityStateCAPostedDec 10, 2025, 12:00 AM UTCDueMar 03, 2026, 08:00 PM UTCExpired

Federal opportunity from High Speed Rail Authority. Place of performance: CA. Response deadline: Mar 03, 2026.

Federal Bid Partners service match

Support routes that fit this solicitation

Need help writing this bid?
Route this notice into Federal Bid Partners proposal lanes and align it with the right plan, compliance support, and submission workflow.
Open proposal plans

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,706,841,172
Sector total $2,706,841,172 • Share 100.0%
Live
Median
$318,072
P10–P90
$42,300$2,065,904
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,706,841,172)
Deal sizing
$318,072 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Live POP
Place of performance
Fresno County
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
CA20260009 (Rev 0)
Match signal: state match • county matchOpen WD
Published Jan 02, 2026California • Fresno, Kern, Madera +4
Rate
Electricians: One and two-stories
Base $19.00Fringe $7.72
Rate
Three and Four-stories
Base $37.50Fringe $22.18
+79 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 79 more rate previews.
Davis-BaconBest fitstate match • county match
CA20260009 (Rev 0)
Open WD
Published Jan 02, 2026California • Fresno, Kern, Madera +4
Rate
Electricians: One and two-stories
Base $19.00Fringe $7.72
Rate
Three and Four-stories
Base $37.50Fringe $22.18
Rate
ELECTRICIAN
Base $48.50Fringe $30.09
+78 more occupation rates in this WD
Davis-Baconstate match
CA20260026 (Rev 2)
Open WD
Published Jan 23, 2026California • San Bernardino
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+129 more occupation rates in this WD
Davis-Baconstate match
CA20260024 (Rev 2)
Open WD
Published Jan 23, 2026California • Orange
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+127 more occupation rates in this WD
Davis-Baconstate match
CA20260015 (Rev 2)
Open WD
Published Jan 23, 2026California • Ventura
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+127 more occupation rates in this WD

Point of Contact

Name
Gordon Miyauchi
Email
FresnoStationEW@hsr.ca.gov
Phone
Not available
Name
Gordon Miyauchi
Email
FresnoStationEW@hsr.ca.gov
Phone
Not available

Agency & Office

Department
High Speed Rail Authority
Agency
Not available
Subagency
Not available
Office
Not available
Contracting Office Address
Not available

Description

02/13/2026: Round 5 of Bidder Inquiries and Responses for Construction of Fresno Station Early Works has been posted here on Cal eProcure. 02/10/2026: Round 4 of Bidder Inquiries and Responses for Construction of Fresno Station Early Works has been posted here on Cal eProcure. 02/04/2026: Addendum 4 and Round 3 of Bidder Inquiries and Responses for Construction of Fresno Station Early Works has been posted here on Cal eProcure. The procurement schedule has been updated below: - IFB Released: December 10, 2025 - In-Person Pre-Bid Conference and Job Walk: December 18, 2025 - Addendum 1 Released: December 23, 2025 - Addendum 2 Released: December 30, 2025 - Addendum 3 Released: January 29, 2026 - Addendum 4 Released: February 4, 2026 (Addendum 4) - Bidder Inquiries Due: February 10, 2026 - Responses to Bidder Inquiries released: February 13, 2026 - Final day for Bidders to Request a Project Site inspection: February 20, 2026 (Addendum 4) - Bids Due: March 3, 2026 (noon Pacific) - Bid Opening: March 3, 2026 (2 p.m. Pacific) - Escrowed Bid Documents Due: March 6, 2026 - Anticipated Notice to Proceed: April 2026 - Anticipated first Working Day: April 2026 01/29/2026: Addendum 3 for Construction of Fresno Station Early Works has been posted here on Cal eProcure. The procurement schedule has been updated below: - IFB Released: December 10, 2025 - In-Person Pre-Bid Conference and Job Walk: December 18, 2025 - Bidder Inquiries Due: February 10, 2026 (Addendum 3) - Responses to Bidder Inquiries released: February 13, 2026 (Addendum 3) - Bids Due: March 3, 2026 (noon Pacific) (Addendum 3) - Bid Opening: March 3, 2026 (2 p.m. Pacific) (Addendum 3) - Anticipated Notice to Proceed: April 2026 - Anticipated first Working Day: April 2026 01/20/2026: Round 2 of Bidder Inquiries and Responses (January 9 - 20, 2026) for Construction of Fresno Station Early Works have been posted here on Cal eProcure. 01/09/2026: Round 1 of Bidder Inquiries and Responses (through January 8, 2026) for Construction of Fresno Station Early Works have been posted here on Cal eProcure. 12/30/2025: Addendum 2 for Construction of Fresno Station Early Works has been posted here on Cal eProcure. The procurement schedule has been updated below: - IFB Released: December 10, 2025 - In-Person Pre-Bid Conference and Job Walk: December 18, 2025 - Bidder Inquiries Due: January 9, 2026 (Addendum 2) - Responses to Bidder Inquiries released: January 16, 2026 (Addendum 2) - Bids Due: March 2, 2026 (noon Pacific) (Addendum 2) - Bid Opening: March 2, 2026 (2 p.m. Pacific) (Addendum 2) - Anticipated Notice to Proceed: April 2026 (Addendum 2) - Anticipated First Working Day: April 2026 12/23/2025: Addendum 1 for Construction of Fresno Station Early Works has been posted here on Cal eProcure. The procurement schedule has been updated below: - IFB Released: December 10, 2025 - In-Person Pre-Bid Conference and Job Walk: December 18, 2025 - Bidder Inquiries Due: December 30, 2025 (Addendum 1) - Responses to Bidder Inquiries released: January 15, 2026 - Bids Due: February 17, 2026 (noon Pacific) (Addendum 1) - Bid Opening: February 17, 2026 (2 p.m. Pacific) (Addendum 1) - Anticipated Notice to Proceed: March 2026 - Anticipated first Working Day: April 2026 12/10/2025: The California High-Speed Rail Authority has released an Invitation for Bids (IFB) on a construction contract which includes accessibility improvements, hazardous materials abatement/removal, and the seismic retrofit of the historic Fresno Southern Pacific Railroad Depot and build-out of plazas servicing the two future Fresno station entrances located in downtown and Chinatown, including utility upgrades, relocations and connections, demolition, park and plaza development, station multimodal parking, and EV charging. The resulting contract will be 505 working days with an estimated cost of $50 million. Updates, including responses to bidder's inquiries, and any addenda will be provided here on Cal eProcure. The timeline for this procurement is as follows: - IFB Released: December 10, 2025 - In-Person Pre-Bid Conference and Job Walk: December 18, 2025 - Bids Due: February 9, 2026 (noon Pacific) - Bid Opening: February 9, 2026 (2 p.m. Pacific) - Notice of Proposed Award: February 27, 2026 - Contract Execution and Notice to Proceed: March 2026 Bids will be submitted exclusively through the Trimble Unity Construct Bid Portal website https://gateway.gov.e-builder.net/app/bidders/landing?accountid=5fad66cd-a109-4e2a-9572-ab69f7f6914c&projectid=13eb8bb3-72ad-4854-9df7-40f90dbc23de&bidpackageid=db4668bb-657f-4edd-be89-15629913aabd. Instructions for how to register and submit bids are available in the Trimble Bid Portal User Guide which is attached as a reference manual. Questions regarding this procurement should be submitted to Gordon Miyauchi at FresnoStationEW@hsr.ca.gov or (916) 324-1541.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.