| Occupation | Base | Fringe |
|---|---|---|
| Electricians: One and two-stories | $19.00 | $7.72 |
| Three and Four-stories | $37.50 | $22.18 |
| ELECTRICIAN | $48.50 | $30.09 |
| OPERATOR: Power Equipment (AREA 1:) GROUP 1 | $65.54 | $34.69 |
| GROUP 2 | $64.09 | $34.69 |
| GROUP 3 | $62.69 | $34.69 |
| GROUP 4 | $61.36 | $34.69 |
| GROUP 5 | $60.15 | $34.69 |
| GROUP 6 | $58.88 | $34.69 |
| GROUP 7 | $57.79 | $34.69 |
| GROUP 8 | $56.71 | $34.69 |
| GROUP 8-A | $54.69 | $34.69 |
| OPERATOR: Power Equipment (Cranes and Attachments - AREA 1:) GROUP 1 Cranes | $66.39 | $34.69 |
| Oiler | $43.79 | $31.15 |
| Truck crane oiler | $46.08 | $31.15 |
| GROUP 2 Cranes | $64.70 | $34.69 |
| Oiler | $42.83 | $31.15 |
| Truck crane oiler | $45.07 | $31.15 |
| GROUP 3 Cranes | $63.06 | $34.69 |
| Hydraulic | $44.44 | $31.15 |
| Oiler | $42.55 | $31.15 |
| Truck crane oiler | $44.83 | $31.15 |
| GROUP 4 Cranes | $45.76 | $31.15 |
| OPERATOR: Power Equipment (LANDSCAPE WORK ONLY) GROUP 1 AREA 1 | $55.85 | $28.56 |
| AREA 2 | $57.85 | $28.56 |
| GROUP 2 AREA 1 | $52.25 | $28.56 |
| AREA 2 | $54.25 | $28.56 |
| GROUP 3 AREA 1 | $47.64 | $28.56 |
| AREA 2 | $49.64 | $28.56 |
| OPERATOR: Power Equipment (Cranes, Piledriving & Hoisting Equipment) GROUP 1 | $46.65 | $25.25 |
| GROUP 10 | $49.65 | $25.25 |
| GROUP 11 | $50.65 | $25.25 |
| GROUP 12 | $51.65 | $25.25 |
| GROUP 13 | $52.65 | $25.25 |
| GROUP 2 | $47.43 | $25.25 |
| GROUP 3 | $47.72 | $25.25 |
| GROUP 4 | $47.86 | $25.25 |
| GROUP 5 | $48.08 | $25.25 |
| GROUP 6 | $48.19 | $25.25 |
| GROUP 7 | $48.31 | $25.25 |
| GROUP 8 | $48.48 | $25.25 |
| GROUP 9 | $48.65 | $25.25 |
| OPERATOR: Power Equipment GROUP 1 | $45.30 | $25.25 |
| GROUP 2 | $46.08 | $25.25 |
| GROUP 3 | $46.37 | $25.25 |
| GROUP 5 | $48.96 | $25.25 |
| GROUP 6 | $48.08 | $25.25 |
| GROUP 7 | $49.18 | $25.25 |
| GROUP 8 | $48.19 | $25.25 |
| GROUP 9 | $49.29 | $25.25 |
| GROUP 10 | $48.31 | $25.25 |
| GROUP 11 | $49.41 | $25.25 |
| GROUP 12 | $48.48 | $25.25 |
| GROUP 13 | $48.58 | $25.25 |
| GROUP 14 | $48.61 | $25.25 |
| GROUP 15 | $48.69 | $25.25 |
| GROUP 16 | $48.81 | $25.25 |
| GROUP 17 | $48.98 | $25.25 |
| GROUP 18 | $49.08 | $25.25 |
| GROUP 19 | $49.19 | $25.25 |
| GROUP 20 | $49.31 | $25.25 |
| GROUP 21 | $49.48 | $25.25 |
| GROUP 22 | $49.58 | $25.25 |
| GROUP 23 | $49.69 | $25.25 |
| GROUP 24 | $49.81 | $25.25 |
| GROUP 25 | $49.98 | $25.25 |
| Painters: Brush | $43.45 | $22.80 |
| PAINTER (Including Lead Abatement) (1) Repaint | $25.40 | $15.87 |
| All other work | $34.08 | $18.50 |
| SOFT FLOOR LAYER | $38.53 | $23.19 |
| SOFT FLOOR LAYER | $48.54 | $26.59 |
| SOFT FLOOR LAYER | $45.15 | $19.43 |
| CEMENT MASON/CONCRETE FINISHER | $39.20 | $19.71 |
| CEMENT MASON/CONCRETE FINISHER | $47.70 | $27.07 |
| Sewer & Storm Drain Work | $48.84 | $23.58 |
| PLUMBER (All other work) | $48.83 | $22.73 |
| ROOFER | $45.76 | $16.86 |
| ROOFER | $49.65 | $22.19 |
| BRICKLAYER | $17.00 | $1.12 |
| CARPENTER | $21.24 | $7.20 |
| Laborer, General | $7.25 | $0.00 |
Related Wage Determinations
View directory →Davis-Bacon
CA20260026 (Rev 2)
California • San Bernardino
Davis-Bacon
CA20260012 (Rev 2)
California • San Luis Obispo
Davis-Bacon
CA20260025 (Rev 2)
California • Riverside
Davis-Bacon
CA20260001 (Rev 2)
California • San Diego
Davis-Bacon
CA20260024 (Rev 2)
California • Orange
Davis-Bacon
CA20260015 (Rev 2)
California • Ventura