- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
OPS EAID GENERATOR REPLACEMENT
Solicitation from DEPT OF THE AIR FORCE • DEPT OF DEFENSE. Place of performance: NE. Response deadline: Feb 19, 2026. Industry: NAICS 335312 • PSC 6115.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Awarded-market signal for NAICS 335312 (last 12 months), benchmarked to sector 33.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 335312
Description
This requirement is for two (2) 200kW generators. The generators to be replaced are at the end of their service life and need to be replaced by more efficient and EPA compliant generators.
The following items shall be provided: 2 each, Cummins C200D2RE: T4F Mobile 200 kW standby output/ 180 kW prime output; 60Hz: Cummins QSB 6.7L generators (available via GSA) and paralleling harness.
Amendment 00001 09FEB2026 - 52.212-1 Amended in solicitation to reflect new questions due date of 12FEB2026 by 10:00 AM.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Department of the Air Force is soliciting bids for the replacement of two (2) 200kW generators, specifically requiring Cummins C200D2RE generators compliant with EPA standards. The solicitation is posted on 2026-02-09, with a response deadline of 2026-02-19. This project is a small business set-aside under NAICS 335312, indicating a preference for qualified small businesses to participate.
Replace outdated generators that are at the end of their service life with more efficient units that meet current EPA compliance standards.
- Identify qualified suppliers for Cummins C200D2RE generators.
- Prepare compliance documentation per EPA standards.
- Submit proposal including cost estimates for equipment and installation.
- Outline a plan for removing existing generators and installing new units.
- Completed proposal including pricing and compliance documentation.
- Technical specifications sheet for Cummins generators.
- W-9 tax form for Small Business Verification.
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific place of performance is not listed.
- No period of performance provided.
- No details on the proposal evaluation criteria are available.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.