- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
BACKPLANE ASSEMBLY
Sources Sought from DEFENSE LOGISTICS AGENCY • DEPT OF DEFENSE. Place of performance: AL. Response deadline: Mar 30, 2026. Industry: NAICS 334412 • PSC 5998.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Awarded-market signal for NAICS 334412 (last 12 months), benchmarked to sector 33.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 25 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS 334412
Description
Sources Sought Notice: SPRDL1-26-R-0072
Item Name: BACKPLANE ASSEMBLY
NSN: 5998013558142
Part Number: 12347083
Quantity: 65
Option Quantity: 65
End Item: Abrams FOV
Response Date: 30 Marchr 2026
Requirements Description: The Backplane Assembly is a critical component of the Abrams Fighting Vehicle System (AFVS) Engine. The Government does not have drawings for this item that are suitable for competitive procurement. The TDP is fully defined, but the government does not have full data rights.
This survey is published in compliance with FAR Part 10, Market Research. The purpose of this survey is to canvas the industry for any possible other sources. This request for capability information does not constitute a request for proposals. Submission of any information in response to this market research is purely voluntary. The Government assumes no financial responsibility for any costs incurred in responding or in any subsequent exchange of information.
Contractors interested in becoming a source of supply need to meet the requirements of the Source Approval Program including vehicle level qualification testing, at their own expense. The TACOM Life Cycle Management Command, Competition Management Office (CMO), is the lead proponent for the Source Approval Program. Specific information and point of contact for the Source Approval Program is available at https://tacom.army.mil/ and select Ombudsman from the menu.
DIBBS / DLA Details
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.