S205--Waste, Solid, and Recycling | Southern Ohio VA Medical Centers | Chillicothe, Cincinnati, Columbus, and Dayton VA Medical Facilities
Combined Synopsis Solicitation from VETERANS AFFAIRS, DEPARTMENT OF • VETERANS AFFAIRS, DEPARTMENT OF. Place of performance: US Department of Veterans Affairs Please see PWS for location information.. Response deadline: Apr 03, 2026. Industry: NAICS 562111 • PSC S205.
Market snapshot
Awarded-market signal for NAICS 562111 (last 12 months), benchmarked to sector 56.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
Point of Contact
Agency & Office
More in NAICS 562111
Description
The purpose of this solicitation is to update the period of performance, provide a new Price-Cost Schedule excel file with clarification, and extend the current solicitation. The estimated period of performance is hereby changed to 6/1/2026 5/31/2027. Any instance of 4/1 start date shall be replaced with 6/1. Any instance of 3/31 end date shall be replaced with 5/31. Price-Cost_Schedule 26Q0297 v2 is attached to this amendment that identifies all the changed start and end dates. All offerors are to use the v2 version of this document in order to submit their price quote. To clarify the Price-Cost_Schedule. There are four (4) separate CLINS for each facility for each period of performance, they are as follows: Tonnage estimates How many tons of solid waste or recycling we anticipate using. Rental fees Monthly rental fees for equipment Haul Fees Fully burdened price per haul (Recurring Pickups) at the quantities specified in column G of the Excel file. On-call / Emergent pickup fees Fully burdened price for each haul that is outside the scope of recurring pickups (i.e., a pickup between a series of pickups). All vendors must provide all items listed in the Quote Preparation Instructions to be considered responsive. Large businesses are required to submit a formal subcontracting plan. Small businesses are not required to submit a formal subcontracting plan; however, if they intend to utilize a subcontractor, they must identify the subcontractor and describe the work the subcontractor will perform. The Solicitation deadline is hereby extended until 1:30PM EST on 4/3/2026. All responses shall be emailed to Joshua.Kovar@VA.gov prior to the deadline. ATTACHMENTS OR DOCUMENTS:
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.