Skip to content
Department of Veterans Affairs

Y1BG--EHRM Infrastructure Upgrades Construction - Bath - Project 528A6-22-700

Solicitation: 36C77626B0015
Notice ID: bf2be90646dc42e0b1f0d50043767824
TypeSolicitationNAICS 236220PSCY1BGSet-AsideSDVOSBCDepartmentDepartment of Veterans AffairsStateNYPostedApr 07, 2026, 12:00 AM UTCDueMay 13, 2026, 05:00 PM UTCCloses in 32 days

Solicitation from VETERANS AFFAIRS, DEPARTMENT OF • VETERANS AFFAIRS, DEPARTMENT OF. Place of performance: NY. Response deadline: May 13, 2026. Industry: NAICS 236220 • PSC Y1BG.

Market snapshot

Awarded-market signal for NAICS 236220 (last 12 months), benchmarked to sector 23.

12-month awarded value
$29,123,001,035
Sector total $37,340,646,106 • Share 78.0%
Live
Median
$3,054,050
P10–P90
$307,254$50,502,702
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
78.0%
share
Momentum (last 3 vs prior 3 buckets)
-91%(-$24,162,898,361)
Deal sizing
$3,054,050 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for NY
Live POP
Place of performance
Bath, New York • 14810 United States
State: NY
Contracting office
Independence, OH • 44131 USA

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
NY20260031 (Rev 1)
Match signal: state matchOpen WD
Published Jan 30, 2026New York • Herkimer
Rate
coatings and finishings to all types of mechanical systems. Also the application of firestopping material to openings and penetrations in walls, floors, ceilings, curtain walls and all lead abatement
Base $43.25Fringe $27.29
Rate
F WORK: DUTIES LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not from mechanical system
Base $38.50Fringe $25.04
+50 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 50 more rate previews.
Davis-BaconBest fitstate match
NY20260031 (Rev 1)
Open WD
Published Jan 30, 2026New York • Herkimer
Rate
coatings and finishings to all types of mechanical systems. Also the application of firestopping material to openings and penetrations in walls, floors, ceilings, curtain walls and all lead abatement
Base $43.25Fringe $27.29
Rate
F WORK: DUTIES LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not from mechanical system
Base $38.50Fringe $25.04
Rate
BOILERMAKER
Base $43.34Fringe $27.66
+49 more occupation rates in this WD
Davis-Baconstate match
NY20260037 (Rev 1)
Open WD
Published Jan 30, 2026New York • Otsego
Rate
coatings and finishings to all types of mechanical systems. Also the application of firestopping material to openings and penetrations in walls, floors, ceilings, curtain walls and all lead abatement
Base $43.25Fringe $27.29
Rate
F WORK: DUTIES LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not from mechanical system
Base $38.50Fringe $25.04
Rate
BOILERMAKER
Base $43.34Fringe $27.66
+39 more occupation rates in this WD
Davis-Baconstate match
NY20260022 (Rev 1)
Open WD
Published Jan 30, 2026New York • Jefferson
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (Duct, Pipe, & Mechanical System Insulation)
Base $43.25Fringe $27.29
Rate
BRICKLAYER (Includes Pointing, Caulking, and Cleaning)
Base $33.45Fringe $20.14
Rate
TILE SETTER
Base $31.81Fringe $17.50
+29 more occupation rates in this WD
Davis-Baconstate match
NY20260051 (Rev 1)
Open WD
Published Jan 30, 2026New York • Tompkins
Rate
BRICKLAYER BUILDING CONSTRUCTION Bricklayers, Cement Masons, Stone Masons, Pointers, Caulkers, and Cleaners
Base $29.87Fringe $17.79
Rate
Marble Masons, Tile Layers, and Terrazzo Workers
Base $34.24Fringe $23.61
Rate
HEAVY/HIGHWAY Cement Masons
Base $38.63Fringe $25.05
+23 more occupation rates in this WD

Point of Contact

Name
Thomas Council
Email
Thomas.Council@va.gov
Phone
Not available
Name
Donald A. Marsh III
Email
Donald.Marsh2@va.gov
Phone
Not available

Agency & Office

Department
VETERANS AFFAIRS, DEPARTMENT OF
Agency
VETERANS AFFAIRS, DEPARTMENT OF
Subagency
PCAC (36C776)
Office
Not available
Contracting Office Address
Independence, OH
44131 USA

More in NAICS 236220

Description

The Bath VAMC is seeking a general contractor to furnish all labor, materials, supervision and perform all work necessary to complete the EHRM Infrastructure Upgrades Construction project. Work includes general construction, demolition, sitework, necessary removal of existing structures and construction.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.