- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
CASE,ELECTRICAL-ELE
Solicitation from DEFENSE LOGISTICS AGENCY • DEPT OF DEFENSE. Place of performance: United States. Response deadline: Feb 27, 2026. Industry: NAICS 334419 • PSC 6625.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Awarded-market signal for NAICS 334419 (last 12 months), benchmarked to sector 33.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 334419
Description
Item: CASE, ELECTRICAL-ELE (ASU, COMMON RESOURCES NO.4, BALL LOCK)
NSN: 6625-01-629-7481
Pat number: 13038814
Quantity: 1 (100% option)
First Article Test (FAT) is required.
Technical Data Package link below:
https://sam.gov/workspace/contract/opp/39dd4a24e6114b52bb880eba0dff01cf/view
DIBBS / DLA Details
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Defense Logistics Agency is soliciting bids for the CASE, ELECTRICAL-ELE with NSN 6625-01-629-7481, as outlined in solicitation number SPRDL126Q0036. The opportunity requires a quantity of 1 with a 100% option, and bidders must complete a First Article Test (FAT). Responses are due by February 27, 2026, making it crucial for interested parties to prepare accordingly and access the Technical Data Package linked in the brief.
The buyer aims to procure an electrical case, specifically the ASU, COMMON RESOURCES NO.4, BALL LOCK, with strict requirements for testing and compliance.
- Review Technical Data Package
- Prepare response by February 27, 2026
- Conduct First Article Test (FAT)
- Submit bid documentation and compliance checklist
- Completed bid form
- FAT plan and timeline
- Technical data compliance report
- Company capabilities statement
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Details on the period of performance
- Specifics on the First Article Test requirements
- Clarification on performance metrics for the electrical case
- Information on any required certifications
- Insights on previous contracts for similar items
- Expected delivery timelines after contract award
- Potential penalties for non-compliance
- Additional resources for Technical Data Package interpretation
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.