CHIPS R&D: Fourier-Transform Infrared (FTIR) Spectrometer
Combined Synopsis Solicitation from NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY • COMMERCE, DEPARTMENT OF. Place of performance: MD. Response deadline: Feb 23, 2026. Industry: NAICS 334519 • PSC 6640.
Market snapshot
Awarded-market signal for NAICS 334519 (last 12 months), benchmarked to sector 33.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 334519
Description
See attachments Combined Synopsis Soliciation, Attachment 1 - Statement of Work, and Attachment 2 - Applicable Provisions and Clauses for solicaition details.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
NIST has issued a Combined Synopsis/Solicitation (Solicitation No. 1333ND26QNB030070) for a CHIPS R&D Fourier-Transform Infrared (FTIR) Spectrometer under PSC 6640 and NAICS 334519. The notice is posted 2026-02-13 with offers due by 2026-02-23 16:00 UTC, indicating a short response window. The solicitation directs vendors to review the Combined Synopsis/Solicitation plus Attachment 1 (Statement of Work) and Attachment 2 (Applicable Provisions and Clauses) for all requirements and terms. This is an SBA set-aside, so bidders should verify their small business eligibility and ensure their quote aligns with the specific SOW and clause set in the attachments.
Procure an FTIR spectrometer to support CHIPS R&D activities for the National Institute of Standards and Technology, using the requirements and acceptance criteria defined in the attached Statement of Work and the contractual terms in the Applicable Provisions and Clauses attachment.
- Download and review the Combined Synopsis/Solicitation, Attachment 1 (Statement of Work), and Attachment 2 (Applicable Provisions and Clauses) from the notice resource links.
- Map the SOW requirements into a compliance matrix for the proposed FTIR spectrometer (technical specs, configuration, accessories, and any required services).
- Confirm the set-aside status (SBA) and your eligibility under NAICS 334519 prior to bidding.
- Develop the technical quote/package: proposed make/model/configuration, how it meets each SOW requirement, and any deviations/assumptions clearly called out.
- Develop the pricing quote consistent with the solicitation instructions and any clause requirements (e.g., delivery terms, warranty, options if any).
- Assemble representations/certifications and complete any required clause-driven submissions referenced in Attachment 2.
- Submit the response by the stated deadline (2026-02-23 16:00 UTC) via the method specified in the Combined Synopsis/Solicitation attachment.
- Completed quote/offer per the Combined Synopsis/Solicitation instructions (format and submission method as specified in the attachment).
- Technical compliance matrix against Attachment 1 (Statement of Work) for the proposed FTIR spectrometer (make/model/configuration) with clear references to datasheets.
- Product datasheets/spec sheets for the proposed FTIR spectrometer configuration and included accessories.
- Warranty and support description consistent with SOW and clauses (and any OEM authorization letter if bidding as a reseller, if required by the solicitation).
- Pricing breakdown as required by the solicitation (include any delivery/installation/training line items only if the SOW requests them).
- Completed provisions, clauses, and representations/certifications identified in Attachment 2 (Applicable Provisions and Clauses).
- Confirmation of SBA set-aside eligibility under NAICS 334519 (as required by the solicitation instructions).
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Attachment 1 (Statement of Work) technical specifications, required configuration/accessories, and acceptance criteria are not provided in the brief.
- Attachment 2 (Applicable Provisions and Clauses) content is not provided in the brief.
- Delivery/location details (place of performance, shipping/installation site) are not provided in the brief.
- Period of performance/delivery schedule requirements are not provided in the brief.
- Submission instructions (method, format, required forms) from the Combined Synopsis/Solicitation attachment are not provided in the brief.
- Evaluation criteria and basis of award are not provided in the brief.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.