J045--626A4-22-202 - AJP-Upgrade Steam Distribution System
Solicitation from VETERANS AFFAIRS, DEPARTMENT OF • VETERANS AFFAIRS, DEPARTMENT OF. Place of performance: {"city":{},"state":{},"country":{}}. Response deadline: Apr 20, 2026. Industry: NAICS 238220 • PSC J045.
Market snapshot
Awarded-market signal for NAICS 238220 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
Point of Contact
Agency & Office
More in NAICS 238220
Description
STATEMENT OF WORK GENERAL INFORMATION Title of Project: Project# 626A4-22-202 AJP-Upgrade Steam Distribution System Scope of Work: The contractor shall furnish all labor, material, equipment and supervision necessary to accomplish the work for Project# 626A4-22-202 "AJP-Upgrade Steam Distribution System at the Tennessee Valley Healthcare System, VA Medical Center, 3400 Lebanon Road, Murfreesboro, TN 37129 in accordance with the specifications and drawings. Work includes demolition and new construction including, but not limited to, general construction, civil, structural, architectural, mechanical, plumbing, electrical, low voltage, industrial hygiene, and certain other items. Statement Of Bid Item(S) BID ITEM 1: Includes all work per drawings and specifications. Period of Performance: 546 calendar days GENERAL REQUIREMENTS All work, including materials, will be warranted for a period of one year unless otherwise indicated in the specifications and drawings. Normal working hours are Monday through Thursday from 6 a.m. to 4:30 p.m. Contractor may be required to work some nights and or weekends to perform this work and maintain functionality of affected areas, and to minimize disruptions to the Medical Center s operations. Weekend and evening work shall be identified on the project schedule submitted by the contractor and approved by the VA before work begins. Steam shutdowns will not be allowed if outside temperatures are below 58 F or a temporary means of supporting the building(s) is identified prior to the shutdown. Contractor must consider this when producing a schedule. Outside temperature related issues will result in no additional cost to the government. No clamp-on saddles are allowed in the system. In addition to the specifications and drawing s locations, provide an additional 30 analog pressure gauges to install at locations coordinated with the COR during construction. Ductile and Cast-iron materials are strictly prohibited unless otherwise noted in the specifications and drawings. See specifications and drawings for additional requirements. ADDITIONAL ATTACHMENTS Attachment 2A - Regulated Building Materials Survey Report Attachment 2B - Engineering Service Confined Space Entry Policy Attachment 2C - BOD Electrical Condensate Packages END OF STATEMENT OF WORK
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.