The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.
The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements.
Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.
19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included.
5 June 2025: Updated list of synopsis for potential pool 1 awards added.
11 August 2025: Updated list of synopsis for potential pool 1 awards added.
23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030.
15 Dec 2025: Synopsis for Anticipated Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
31 Dec 2025: 2nd, additional synopsis for Anticipated Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
Files size/type shown when available.
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.