6515--Ultrasonic Cleaning System
Solicitation from VETERANS AFFAIRS, DEPARTMENT OF • VETERANS AFFAIRS, DEPARTMENT OF. Place of performance: {"city":{},"state":{},"country":{}}. Response deadline: Mar 13, 2026. Industry: NAICS 334510 • PSC 6515.
Market snapshot
Awarded-market signal for NAICS 334510 (last 12 months), benchmarked to sector 33.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
Point of Contact
Agency & Office
More in NAICS 334510
Description
Amendment to provide response to Questions for RFQ 36C24826Q0364. RFQ 36C24826Q0336 QUESTIONS & RESPONSES Q1. Is this an SDVOSB set-aside? A1. It is 100% SDVOSB Set-Aside Q2. Can we be considered for rule of 2? A2. As indicated in Block 10 of the 1449 (first page of RFQ), only SDVOSB distributors will be considered for this solicitation since it is a 100% Set-Aside. Q3. Clarify the required tank capacity, internal dimensions, and any maximum footprint constraints for the Ultrasonic cleaning system? A3. Twin basins 30 gallon/basin, 80lb total weight capacity Q4. Clarify the minimum essential features, modes, or functionalities required for this Ultrasonic Cleaning System?" A4. Twin basins Q5. Is there a specific manufacturer required, or is this a "Brand Name or Equal" requirement? A5. Getinge Triton 72 or equal. Q6. Are we required to include starter consumables (e.g., enzymatic detergents) or specific instrument baskets/trays in our quote? A6. Contractor will provide startup supplies Q7. Does the Government require the contractor to provide inside delivery, uncrating, setup, installation, and/or user training, or will VA Sterile Processing Service (SPS) personnel handle the installation? A7. Contractor will be responsible for delivery, uncrating and installation. Q8. What are the electrical requirements for the designated installation space (e.g., 110V, 208V, or 240V; single or three-phase)? A8. 208V Q9. Are there specific plumbing requirements or constraints at the installation site for water supply and drainage? A9. No special plumbing or drainage requirement at site. Q10. Is there an existing unit that needs to be decommissioned, removed, and disposed of by the contractor? A10. No Q11. What is the anticipated Required Delivery Date (RDD) for this procurement? A11. Within 60 days of contract award Q12. Does the Orlando VA have a loading dock available for receiving, or will a delivery truck with a lift-gate be required? A12. Delivery will be at a loading dock Q13. Are there any doorway width or elevator size restrictions along the delivery path from the loading dock to the final installation room? A13. No Q14. What are the Government's warranty requirements (e.g., 1-year parts and labor)? A14. 1 year
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.