- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
FY26 Airfield Runway Taxiway Light Removal
Sources Sought from DEPT OF THE AIR FORCE • DEPT OF DEFENSE. Place of performance: TX. Response deadline: Mar 18, 2026. Industry: NAICS 238210 • PSC J062.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Awarded-market signal for NAICS 238210 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 43 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS 238210
Description
The Government anticipates the need to replace the raised lights and signs in relation to the B-52 RADAR Modernization Program as the B-52 aircraft is towed or taxied on the runway as defined in the draft Statement of Work (SOW). Contractor shall be responsible for ensuring the B-52 has access to the runway from Boeing and ensure the lights and signs are restored back to original condition. The B-52 path will be from the Boeing Ramp to taxiway Echo, crossing Taxiway Alpha, and stay on Taxiway Echo to the runway. The runway and taxiway lights and runway signs, as described in the drafted SOW, are included in this contract.
After the runway lights/signs are reinstalled, if found inoperable as originally determined, then the contractor shall repair the lights/signs. Contractor shall be responsible for lights/signs that were damaged during this contract, if the Government has replacement parts available, they may be used; however, the Contractor shall be responsible for replenishing the Government’s stock with identical part(s). Please complete and return the attached Sources Sought questionnaire NTL 18 Mar 26, 1:00 PM CST.
Participation in this market research is strictly voluntary.
Attachments:
1. Sources Sought Questionnaire
2. Statement of Work (SOW) FY26 Airfield Runway Taxiway Light Removal (DRAFT)
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.