- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
Car Wash Rack System Cannon AFB
Sources Sought from DEPT OF THE AIR FORCE • DEPT OF DEFENSE. Place of performance: NM. Response deadline: Apr 13, 2026. Industry: NAICS 423850 • PSC 7910.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 40 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS 423850
Description
This sources sought is being extended for the opportunity to gain more information from industry. I have attached pictures of the current car wash and equipment room due to many requests. This latest update is to include some new answers we got on specs of the location as well as add pictures of the electrical panel. Answers are bolded and underlined.
Cannon AFB, NM requires Installation of a new Government-Owned Vehicle (GOV) wash rack system at Building 438. There is already a standing system in place that needs to be replaced. The system must include all necessary pumps, equipment, and controls to service three (3) interior wash bays and one (1) exterior sprayer for oversized vehicles. The project includes removal of the old, deteriorating system and full installation and testing of the new equipment.
- Boom requirements
- Quantity of ceiling booms needed –2 total
- Boom type required for each bay—1 Ceiling and 1 wall mount for brush for each bay
- Boom length / reach required—8 Ft and currently has a hose length of 12-15 ft
- Whether any locations require single or dual boom configurations—Each have a single Ceiling boom for wand and 1 single wall mount for brush for each bay
- For the exterior wash position for oversized vehicles, do you have a preferred way you’d like the boom arms mounted (wall vs overhead/truss)? Wall
- Mounting details
- Ceiling, wall, or truss mounting—Truss mount for ceiling and a wall mount for exterior and 1 each for both bays
- Mounting surface type and dimensions—Ceiling is truss angle iron and wall mount for each 8 ft boom
- Wash bay accessory requirements
- Quantity of wand holders--3
- Quantity of foam brush holders--3
- Quantity of brush buckets--3
- Whether each bay will have foam brush stations--YES
- Sprayer / oversized vehicle area details
- Whether the exterior sprayer requires a boom, hose reel, or wall-mounted setup—Wall mount 100’ reel mount
- Required reach and mounting style—100’ ft wall mount reel wall
- Hose length needed—100’ ft wall mount reel
- System connection details
- Hose sizes—bay hoses 15’ each
- Inlet / outlet connection sizes—1/2 “
- Operating pressure and flow requirements, if known—currently the air compressor is set at 140 PSI
- I noticed the equipment list calls out both 8-position meter boxes and 12-position menu signs—can you confirm which direction you’re planning to go and which functions you require? –8 is suitable
- Can you confirm what electrical service is available (phase/capacity) and any details on the water supply? Electrical panel is single phase. Water supply is direct from base plumbing in the main pump room where the main component is set
- Site documents
- Bay dimensions—Bay dimensions are 15’ X 20’ depth with 15-18’ inner height
This sources sought is for market research purposes only and does not constitute the government to enter into a contractual agreement.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.