Y--The purpose of this solicitation is to repair a dr
Solicitation from NATIONAL PARK SERVICE • INTERIOR, DEPARTMENT OF THE. Place of performance: {"city":{},"state":{},"country":{}}. Response deadline: Feb 17, 2026. Industry: NAICS 237990 • PSC Y1PZ.
Market snapshot
Awarded-market signal for NAICS 237990 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 237990
Description
The purpose of this amendment is to add the documents missing from Amendment 1. All other terms and conditions remain the same. N
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
This solicitation from the National Park Service (NPS) is for a design bid-build project to repair a drainage issue at Tour Stop 7 in Saratoga National Park. The amendment has introduced additional documents necessary for the bid, reflecting the importance of thorough preparation for interested contractors. The solicitation is set aside for Small Business Administration (SBA) qualified bidders, with a response deadline of February 17, 2026.
The National Park Service aims to rectify drainage issues at a specific tour location, ensuring improved visitor experience and infrastructure integrity.
- Site assessment and analysis of drainage issues
- Design development for drainage repair
- Construction management for repairs
- Safety assessments during construction
- Completed bid proposal
- Technical proposal addressing all requirements
- Cost estimate
- SBA certification documentation
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed scope of work in the amendment documents
- Specific budget range for the project
- Timeline for project completion
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.