- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
Fort Belvoir SATOC Roofing IDIQ-W5168W-25-R-A005
Solicitation from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: VA. Response deadline: Sep 30, 2025. Industry: NAICS 238160 • PSC Z2JZ.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Awarded-market signal for NAICS 238160 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 238160
Description
This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.
__________________________________________________
Update as of 26 FEB 2026: The Source Selection Evaluation Board is in progress. Please continue to monitor Sam.gov for further updates.
__________________________________________________
Update as of 22 JAN 2026: The Source Selection Evaluation Board is in progress. Please continue to monitor Sam.gov for further updates.
___________________________________________________
Update as of 2 DEC 2025: The Government is reviewing proposals. Please continue to monitor Sam.gov for further updates.
____________________________________________________
Update as of 15 SEP 2025: At this time, the solicitation for this requirement has been posted. The closing date for this solicitation is 25 SEP 2025.
____________________________________________________
Update as of AUG 2025: At this time, the solicitation for this requirement has been posted. The Government continues to work through answering questions posed by industry. Please continue to monitor Sam.gov for updates.
_________________________________________________
Update as of 10 JUL 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.
__________________________________________________
Update as of 18 JUN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.
___________________________________________________
Update as of 7 APR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming
____________________________________________________
Update as of 6 MAR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.
_____________________________________________________
Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
_____________________________________________________
Update as of 26 NOV 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
_____________________________________________________
Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates. The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting.
__________________________________________________
Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.
____________________________________________________
As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.
The official solicitation is forthcoming.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.