Pactola Loop B Campground Reconstruction Project
Solicitation from FOREST SERVICE • AGRICULTURE, DEPARTMENT OF. Place of performance: SD. Response deadline: Mar 10, 2026. Industry: NAICS 237310 • PSC Z1LB.
Market snapshot
Awarded-market signal for NAICS 237310 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 237310
Description
PROJECT'S NAME: PACTOLA LOOP B CAMPGROUND RECONSTRUCTION PROJECT
Quotes are due by 9:00 a.m. Central Time on March 10, 2026. (Questions were due by 9:00 a.m. Central Time on February 12, 2026. Due to time constraints, and passage of the expiration date for questions, the Government may not respond to additional questions recieved after the issuance of this Amendment.)
Please read this message and ALL documents associated with this project in their entirety. Quotes shall be emailed by the due date and time to the Contract Specialist, Janice King, at janice.king@usda.gov AND to the Conracting Officer, Lucas Dahlman at lucas.dahlman@usda.gov.
02/26/2026: Issuance of Amendment Three (A0003_Summary of Changes_Pactola Loop B Reconstruction). This Amendment was issued to provide answers to additional contractor's questions 18-22. Due to time constraints, and passage of the expiration date for questions, the Government may not respond to additional questions recieved after the issuance of this Amendment. You will find this document in the Attachment/Links section. Quotes are due by 9:00 a.m. Central Time on March 10, 2026. See Attach 1 for quote submission requirements.
02/24/2026: Issuance of Amendment Two (A0002_Summary of Changes_Pactola Loop B Reconstruction). This amendment was issued to provide answers to the additional contractor's questions received, incorporate an updated Attachment 4 which is: Attach 4 - Updated Pactola Loop B Specifications dated 23FEB2026, and to incorporate Attachment 16 which is: Attach 16 - Well Log_1977 Pactola CG. Going forward, use the newly incorporated Attach 4 - Updated Pactola Loop B Specifications dated 23FEB2026 instead of the initial version dated 16Jan2026. In addition, use Attach 16 - Well Log_1977 Pactola CG to assist with question #10 of the Amendment Two (A0002_Summary of Changes_Pactola Loop B Reconstruction). You will find these documents, along with Amendment Two (A0002_Summary of Changes_Pactola Loop B Reconstruction), in the Attachment/Links section. Quotes are due by 9:00 a.m. Central Time on March 10, 2026. See Attach 1 for quote submission requirements.
02/12/2026: Issuance of Amendment One (A0001_Summary of Changes_Pactola Loop B Reconstruction). This amendment was issued to provide answers to contractor's questions and to provide the site visit's attendee's list. See this document in the Attachment/Links section. Quotes are due by 9:00 a.m. Central Time on March 10, 2026. See Attach 1 for quote submission requirements.
See Attach 1 - Solicitation Terms and Conditions with its supporting Attachments, Attach 2 -15. Read each document in its entireity. Attachments are located in the Attachments/Links section.
Solicitation Number 1240LT26Q0010 is being issued as a Request for Quotation for The Pactola Campground Loop B Construction Project. The Campground is on a Forest Service loop road adjacent to Pactola Reservoir. The road is approximately 14 ft wide. The road will be modified with curve widening and shaping for drainage and new surfacing. Generally, the road width will be 16’ for one-way traffic and 24’ for two-way traffic. A new 20 parking stall trailhead will be constructed for the Osprey Trail. The existing Osprey Trail trailhead will be repurposed as overflow and boat trailer parking serving Loop B. Furthermore, Loop B currently has 20 spurs that are primitive and poorly defined. The Campground will be improved to have a total of 36 camping spurs as Base Items. There is currently one Host Site, with power, water, and wastewater vault, located near the center of the campground. The Host Site and associated infrastructure will be relocated to the beginning of the Loop, for improved service to campers. The existing Host Site will become a “Volunteer Site” with upgraded water and electric service and continued use of the sewage vault; there is an Option Item to remove and replace the sewage vault with a new concrete vault. Water system work for this project consists of decommissioning the existing pumphouse and replacing it with a new precast concrete treatment building with upgraded plumbing and controls, replacing all the distribution piping and installing new hydrants. Plan sheets showing additional tent sites on the west side of Loop B and a toilet located in the infield of the Osprey Trailhead parking area are for future construction and will not be part of this contract. This is a Congressionally directed Great American Outdoors Act project that will make improvements to the road - to include design, construction and resurfacing. Pactola Campground Loop B will be reconstructed to increase capacity, improve the water system, and improve host sites with repaired sewage vaults. Camp sites will be designed for modern recreational vehicles using modern design and furnished with modern amenities. The Pactola Reservoir Campground is a seasonal campground operated from approximately mid-May to mid-September annually. The Campground has three Loops: A, B, and C. This project is for reconstruction of Loop B. The Project will be referred to as “Pactola Loop B CG” or “Loop B” throughout the Specifications and Contract documents. The water system at Pactola Reservoir Campground consists of a well with a submersible pump, steel below ground water storage tank, and distribution system with 7 points of use. This system is classified as a Transient Non-Community Public water system. The water system is in poor condition. The well needs pump controls, treatment system, and pump house are not functioning properly, are not compliant with codes and require replacement. The distribution system has numerous leaks, is in poor condition and requires replacement. The existing hydrants are not accessible and require upgrades. The stick-built pumphouse building is in poor condition and has inadequate lighting and inadequate ventilation.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.