Z1DA--Replace Condensate lines and pumps 585-21-113 Construction (VA-26-00027136)

Solicitation: 36C25226B0005
Notice ID: 6cd2032ce90f4e48bb58bc539ae3d00c
TypeSolicitationNAICS 238220PSCZ1DADepartmentDepartment of Veterans AffairsStateMIPostedFeb 25, 2026, 12:00 AM UTCDueMar 26, 2026, 06:00 PM UTCCloses in 29 days

Solicitation from VETERANS AFFAIRS, DEPARTMENT OF • VETERANS AFFAIRS, DEPARTMENT OF. Place of performance: MI. Response deadline: Mar 26, 2026. Industry: NAICS 238220 • PSC Z1DA.

Market snapshot

Awarded-market signal for NAICS 238220 (last 12 months), benchmarked to sector 23.

12-month awarded value
$78,593,083
Sector total $33,301,412,516 • Share 0.2%
Live
Median
$131,890
P10–P90
$4,158$4,764,800
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
0.2%
share
Momentum (last 3 vs prior 3 buckets)
+221309%($78,522,121)
Deal sizing
$131,890 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for MI
Live POP
Place of performance
Iron Mountain, Michigan • 49801 United States
State: MI
Contracting office
Milwaukee, WI • 53214 USA

Point of Contact

Name
Donita L Grace
Email
donita.grace@va.gov
Phone
Not available

Agency & Office

Department
VETERANS AFFAIRS, DEPARTMENT OF
Agency
VETERANS AFFAIRS, DEPARTMENT OF
Subagency
252-NETWORK CONTRACT OFFICE 12 (36C252)
Office
Not available
Contracting Office Address
Milwaukee, WI
53214 USA

More in NAICS 238220

Description

SOLICITATION 36C25226B0005 AMENDMENT A0001 February 24, 2026 Project: Replace Condensate Lines Construction Project Number: 585-21-113 Location: Oscar G Johnson VAMC Hospital Amendment 0001 hereby incorporates the following clarifications/change(s) into the solicitation package. RFI Question and Responses RFI # CONTRACTOR QUESTIONS REFERENCE VA RESPONSE 1 To mitigate any potential complications with submitting a physical bid, either via mail or in person, would you consider changing the submission method to allow for electronic bids via email? Additionally, if this is to remain a mail or hand delivered bid submission, would you consider extending the bid opening to accommodate mailed submissions? With the bid being due on a Monday morning, mail in submissions would need to be sent out on the previous Friday. This leaves open the possibility for last minute changes to develop over the weekend that cannot be taken into consideration by contractors submitting via mail. No electronic submittal. Bid date has been extended to 3/26/2026. 2 Drawings page size appears as 8.5x11 Drawings should be 42x30 - See attached drawings. 3 Is there a survey available for the asbestos mentioned in the specifications. Will it be released with the drawings? 221 times with instructions A survey will be available upon start of the contract. An estimate of quantity is listed on the prints page MD101 4 If there are any site access requirements, preferred site visit windows, or points of contact for field coordination, please advise. See pages 1&6 of Solicitation 5 1. On page 346 of the Specification section 2.3-B #3-b A193 Bolt, A194 Nut, F436 Washer are listed in red.  Are these A193 B7 bolts with A 194 Grade 2H Nut please? 2. On page 350 of the Specification section 2.7-D #2 States (Trap bodies steel) Would a Armstrong Em series inverted bucket trap meet your requirements?  Or Is a Cast Iron Trap body acceptable like a Armstrong 800 series which we have used exclusively on past projects. 3. On Page 354 of the Specification section 3.2-H #1 States (Perform Radiographic Examination).   Do you have a Radiographic Performance specification that is required to be meet?  Or can we hydro test all work to 1.5 times operating pressure to meet the proof testing requirements as we have typically done on previous Oscar G Johnson projects? Pages 346. 350, and 354 Specification A survey will be available upon start of the contract. An estimate of quantity is listed on the prints page MD101 6 If there is a survey available for the asbestos mentioned in the specifications for IRON MOUNTAIN - 585-21-113 REPLACE CONDENSATE LINES. The topic is referenced 221 times, with instructions regarding both removal and installation prohibitions. Will the survey be released along with the drawings soon? Specification A survey will be available upon start of the contract. An estimate of quantity is listed on the prints page MD101 Requests for information (RFI s) Due Date No Change RFI s due Friday, 3/6/2026 no later than 3:00 PM Bid Opening Date extended from 3/23/2026 to: PROPOSAL DUE DATE / TIME: MARCH 26, AT 1:00 P.M. CST. Great Lakes Acquisition Center (GLAC) 115 S. 84th Street, Suite 101 Milwaukee, WI 53214-1476 Drawings S06 Att1 BD Set Rev2 ALL QUESTIONS REGARDING THIS SOLICITATION SHALL BE SENT TO THE FOLLOWING INDIVIDUALS: Donita Grace -- Donita.Grace@va.gov All bidders are responsible for monitoring and downloading any amendments from Contract Opportunities at the following website: https://sam.gov/content/opportunities Contractors shall ensure all amendments are acknowledged on Page 2 of the SF-1442.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.