8-Inch Ductile Iron Water Main Replacement and Sewer Replacement on 21st St. from Eureka St. to Church St. and on Hill St. from Castro St. to Church St. and Various Side Streets
Federal opportunity from San Francisco Public Utilities Commission (SFPUC). Place of performance: CA. Response deadline: Mar 12, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 247 more rate previews.↓
Point of Contact
Agency & Office
Description
The objective of the project to install a new 8-inch pipe to replace the existing cast-iron pipeline. The work under this contract includes the installation of new 8-inch ductile iron pipes on 21st Street, 20th Street, 22nd Street, Hill Street, and various side streets.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.