- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
Former Nebraska Ordnance Plant (FNOP) near Mead, NE, SATOC Synopsis
Special Notice from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: {"streetAddress":"","zip":""}. Response deadline: May 07, 2026. Industry: NAICS 541330 • PSC C219.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Awarded-market signal for NAICS 541330 (last 12 months), benchmarked to sector 54.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
Point of Contact
Agency & Office
More in NAICS 541330
Description
This announcement serves as a synopsis for a SATOC for A/E services to support the Former Nebraska Ordnance Plant near Mead, NE. This will be a Small Business set-aside. Projects relate to performing Hazardous, Toxic, and Radiological Waste (HTRW) activities, including design work involving groundwater treatment systems and extraction wells, groundwater modeling, pre-design investigation, preparation of contract drawings, technical specifications, design analyses, life cycle cost analyses, and computer aided cost estimating, as well as construction phase services, including shop drawing review, design during construction, site visits, etc. This notice does not constitute a commitment on the part of the Government to award a contract, or to pay any costs incurred as a result in replying to this notice. This notice should not be construed as a commitment by the Government for any purpose. Firms are required to submit their qualifications by 2:00pm CT, 7 May 2026.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.