Skip to content
University of California

FIN - HSE Supply Fan 5A 5B Filter Intake Access

Solicitation: Not available
Notice ID: 463865ffef2e08b4dbc7fd7cd1a5d909
DepartmentUniversity of CaliforniaStateCAPostedJan 26, 2026, 12:00 AM UTCDueFeb 17, 2026, 12:00 AM UTCExpired

Federal opportunity from University of California, San Francisco (UCSF). Place of performance: CA. Response deadline: Feb 17, 2026.

Federal Bid Partners service match

Support routes that fit this solicitation

Need help writing this bid?
Route this notice into Federal Bid Partners proposal lanes and align it with the right plan, compliance support, and submission workflow.
Open proposal plans

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,706,841,172
Sector total $2,706,841,172 • Share 100.0%
Live
Median
$318,072
P10–P90
$42,300$2,065,904
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,706,841,172)
Deal sizing
$318,072 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Live POP
Place of performance
CA
Contracting office
California, CA

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
CA20260007 (Rev 3)
Match signal: state matchOpen WD
Published Jan 23, 2026California • Alpine, Amador, Butte +21
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1
Base $84.76Fringe $25.07
Rate
Area 2
Base $64.56Fringe $25.07
+247 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 247 more rate previews.
Davis-BaconBest fitstate match
CA20260007 (Rev 3)
Open WD
Published Jan 23, 2026California • Alpine, Amador, Butte +21
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1
Base $84.76Fringe $25.07
Rate
Area 2
Base $64.56Fringe $25.07
Rate
handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not) AREA 1
Base $35.31Fringe $12.75
+246 more occupation rates in this WD
Davis-Baconstate match
CA20260026 (Rev 2)
Open WD
Published Jan 23, 2026California • San Bernardino
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+129 more occupation rates in this WD
Davis-Baconstate match
CA20260024 (Rev 2)
Open WD
Published Jan 23, 2026California • Orange
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+127 more occupation rates in this WD
Davis-Baconstate match
CA20260015 (Rev 2)
Open WD
Published Jan 23, 2026California • Ventura
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+127 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
University of California, San Francisco (UCSF)
Agency
Not available
Subagency
Not available
Office
Not available
Contracting Office Address
California, CA

Description

The scope of this project is only the installation of new structural platforms for maintenance access and lighting upgrades inside plenum spaces. There are no modifications to the AHU or supply fans during the duration of this project. The AHU serves these plenum areas and must remain operational to maintain cooling throughout the project. The AHU can be ramped down while work is being performed inside the plenum space. This work will be required to be performed at night to minimize the impact on cooling capacity during normal business hours. As part of this project, move‐in cool units will need to be provided in 3 lab spaces within the building. Below is the scope of work in the different mechanical spaces ‐ Level 1 Plenum space for filter access o Add two‐level structural platforms o Replace and modify light fixtures o Access to this section is limited to 34” wide x 36” access door ‐ Level 1 coil access section o add a level structural platform o Replace and modify light fixtures o Access to this section is limited to 34” wide x 36” access door ‐ Leve 1 fan section o Replace light fixtures with LED ‐ Level 3 section o Replace light fixtures with LED ‐ Level 4 outside coil access section o Replace light fixtures with LED o Extend perimeter railing for fall protection. This area will require the removal of bird netting and the replacement of any net that is compromised or damaged

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.