Architect-Engineering Services for the Strategic Petroleum Reserve Project Management Office to include design and inspection services for the construction of modifications and additions to the SPR facilities and connecting pipelines, including limited expansion planning activities. Work to be performed under this contract may consist of feasibility studies, enterprise change proposals (ECPs), conceptual designs; environmental documents (National Environmental Policy Act forms, Environmental Permits etc.) Title I (Preliminary Design), Title II (Definitive Design), and Title III (Post Approved for Construction (AFC)) services.
Files size/type shown when available.
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.
Awarded-market signal for NAICS 541330 (last 12 months), benchmarked to sector 54.