6515--SUPPLY Philips Physiological Monitoring Infrastructure Refresh HCHT
Sources Sought from VETERANS AFFAIRS, DEPARTMENT OF • VETERANS AFFAIRS, DEPARTMENT OF. Place of performance: DC. Response deadline: Mar 03, 2026. Industry: NAICS 339112 • PSC 6515.
Market snapshot
Awarded-market signal for NAICS 339112 (last 12 months), benchmarked to sector 33.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 339112
Description
Page 1 of Page 1 of Page 1 of Page 1 of This is not a solicitation but rather a Request for Information (RFI/Sources Sought) for market research purposes only. Department of Veterans Affairs, Veterans Health Administration, Network Contracting Office 5, is issuing this Sources Sought in order to identify capable firms and obtain information for planning purposes only. Responses must be submitted by 12:00 PM EST, March 3rd, 2026. Submit responses to this Sources Sought via email to james.ferro@va.gov All SDVOSB and VOSB firms that respond shall include proof of SBA certification via https://veterans.certify.sba.gov/All small business firms that respond shall include proof of small business status via their Representations and Certifications in accordance with (FAR 4.1102 Policy). While SDVOSB/VOSB firms are preferred, all capable firms are welcome to respond to this Sources Sought. All respondents to this Sources Sought shall include as part of their response answers to the below questions and provide any additional pertinent information that supports the answers. If there are any ambiguities in this Sources Sought, please identify them in your response. The results of this market research will assist in the development of (1) the requirement, and (2) the acquisition strategy (e.g., socioeconomic set-aside, full and open competition, etc.). VA assumes no responsibility for any costs incurred associated with the preparation of responses. Suggested NAICS: 339112 Surgical and Medical Instrument Manufacturing Suggested PSC: 6515 Medical and Surgical Instruments, Equipment, and Supplies Open to suggestions from the market as to a more proper NAICS and/or PSC, as well as any potential GSA/FSS Schedule SIN categories. Items to be Procured: ***PLEASE SEE ATTACHED EXCEL DOCUMENT*** Statement of Work: Contract Title. Philips Physiological Monitoring Infrastructure Refresh Background. The Washington DC VA Medical Center (DC VAMC) is looking to upgrade the Philips patient monitoring network infrastructure for the entire facility, virtualize servers, expanding monitoring in the Emergency Department and creating additional wireless runs to ensure access in Radiology. This procurement aims to address the outdated Philips Patient Monitoring hardware and network infrastructure at Washington DC VAMC by upgrading and standardizing existing bedside patient monitors to the latest software revision, the physical hardware that is unable to accept software revisions and upgrading the entire PIC iX ecosystem, including a migration to virtual server infrastructure. The equipment shall be made by the same manufacturer as is currently used throughout the hospital to avoid patient care errors, to standardize the interface for the clinicians, and to ensure alarms and clinical configurations are consistent. Scope of Work. The procurement shall include all parts, materials, labor, software/licenses, resources, and training required to upgrade of the Philips patient monitoring network infrastructure for the entire facility, expand the physiological monitoring in the Emergency Department and creating additional wireless runs to Building 6 of our hospital. All items must be covered by manufacturer s warranty and procured through a manufacturer-approved distribution channel. Specifications. 4.1 Equipment 4.2 Required Features Supply Upgrade/standardize all existing bedside Patient Monitors to latest Software revision (M or P) Contractor is responsible for making sure all equipment is compatible with PIC iX 4 Replacement of soon-to-become OOS (Dec 31st, 2025) hardware - MX700, MX800, X2 Upgrade of existing PIC iX ecosystem to latest Software revision UPS for? Migration and upgrade of existing PIC iX virtual server infrastructure to latest Software revision Replacement of OOS Network infrastructure components Infection Control Risk Assessment (ICRA) precautions ex. HEPA cart to access ceiling space, plastic barriers, particulate counter and air scrubber Add new hardware for expansions Emergency Department Reutilization Resus Room Triage New Beside Behavioral Health (BH) Fast Track Network Runs to the basement to provide wireless connection for continuous monitoring for inpatients traveling to Radiology Services Labor for the install of the above equipment shall be included and completed by the original equipment manufacturer (OEM) Labor required to complete the software upgrades shall be included and completed by the OEM Labor for the deinstall of the monitors being upgraded shall be included The contractor shall unbox all of the equipment The contractor shall put together any pieces of the equipment (ie. cables, accessories, mounts) The contractor shall provide inspections of the equipment The contractor shall mount the equipment The contractor shall connect the equipment to the Philips network The contractor shall test functionality Project Management from OEM shall be included for the implementation of the equipment The contractor shall ensure all pieces of the project are communicated and accounted for The contractor shall provide a timeline for installation The contractor shall work with the facility s Infection Control team on site to ensure ICRA requirements are met If additional ICRA requirements are needed that the contractor can t provide, they must communicate to the facility and coordinate with onsite recourses to ensure the requirements will be met before proceeding The contractor shall provide notice of any downtime of services well in advance The contractor shall ensure any workers follow infection control and other guidelines Clinical Configuration and Implementation Services of the equipment shall be included The contractor shall ensure the units are configured to meet the needs of the clinical end users 5.Specific Tasks. 5.1 Delivery. All equipment shall be delivered to: Washington DC VA Medical Center 50 Irving St NW Washington, DC 20422 ATTN: VHAWAS Equipment Committee Contract VA Purchase Order (PO) number shall be included with delivery information (e.g., packing slip). Note: PO number starts with station code 688 followed by a letter and 5 digits (e.g., 688A12345) Delivery Hours: The Warehouse is open to receive deliveries Monday through Friday, 8:00 a.m. to 4:00 p.m., excluding holidays. Contractor shall coordinate delivery with the on-site Point of Contact (POC) and provide shipment tracking information. Contractor shall verify delivery date and time with the on-site POC at least 3 business days prior to scheduled delivery. The contractor shall coordinate shipping of equipment well in advance to ensure facility is ready to receive Delivery is required within 90 days from award of the contract, unless communicated otherwise. 5.2 On Site Procedures. COVID-19 Screening: All persons entering the facility shall be subject to screening for COVID-19 per the current CDC (Center for Disease Control) guidelines. Contract personnel are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government Officials. Time spent on site shall be for a period sufficient to complete the work set forth in the statement of work. On site visits shall be scheduled in advance with the designated on-site POC. Contractor shall check in and out with Biomedical Engineering prior to visiting the worksite for each day of work. The VA campus is non-smoking. Contractor personnel are required to comply with this policy. Parking: it is the responsibility of the Contractor to park in the appropriate designated parking areas. Contractor personnel s tool bags are subject to inspection. Contract shall be accompanied by VA staff at all times, or where abouts should be known throughout the day. 5.3 Installation/Implementation. Installation/Implementation will be completed by personnel certified and knowledgeable with the designated equipment/system. Installation shall be completed within the period of performance. Contractor shall be responsible for any Personal Protection Equipment (PPE) required when performing work on site. Contractor shall submit all removable media to be used on a VA system to Biomedical Engineering for scanning with anti-virus software prior to use. In the case turn-in, exchange, repair, or replacement of equipment containing hard drives used by the VA, the hard drives shall be removed from the equipment and remain in possession of the VA (this includes loaned or rented equipment). The contractor shall take all necessary precautions to prevent damage to any government property. The contractor shall report any damages immediately and shall be assessed current replacement costs for property damaged by the contractor, unless corrective action is taken. Any damaged material (i.e., trees, shrubs, lawn/turf, curbs, gutters, sidewalks, etc.) will be replaced in a timely manner or corrected by the contractor with like materials, at no extra cost to the government, upon approval of the Contracting Officer. 5.4 Training. Contractor shall be responsible for providing training to clinical staff/users. Training is to be scheduled in advance with the designated on-site POC. Education shall be provided prior to and/or at time of installation. Education professional shall be certified to provide instruction on the designated equipment/system. Education curriculum must include operations and set-up, user maintenance, safety, and user troubleshooting tips. 5.5 Inspection and Acceptance. Contractor shall conduct a joint inspection with the on-site POC upon completion of installation. In the event deficiencies are identified, the contractor shall provide the date when the identified deficiencies will be addressed if not addressed on the date of installation. The Contractor shall conduct a joint inspection with the on-site POC after addressing all deficiencies. All deficiencies identified in the joint inspections shall be corrected by the Contractor prior to Government acceptance of the item. Any disputes shall be resolved by the Contracting Officer. 5.6 Deliverables. The Contractor shall provide the below documentation for the proposed equipment to VHAWASEquipmentRequests@va.gov within 10 business days of work completion: Service report. Warranty information. Electronic copy of the Operators Manual. Electronic copies of the complete technical service manuals, including troubleshooting guides, necessary diagnostic software and equipment information, schematic diagrams, and parts lists. Hours of Operation. DC VAMC s normal business hours are Monday-Friday, 8:00 am to 4:30 pm, excluding observed Federal holidays: New Year s Day Labor Day Martin Luther King s Birthday Columbus Day President s Day Veteran s Day Memorial Day Thanksgiving Day Juneteenth Christmas Day Independence Day Any other national holiday as declared by the President of the United States Period of Performance. Delivery within 90 days from contract award. Invoicing. Contractor shall submit a consolidated invoice monthly in arrears of the month for which services are being billed. One all-inclusive monthly invoice shall be provided, which shall contain an invoice number, contract number, obligations order number, and an itemized list of services provided. An acceptable master (all-inclusive) itemized list of services shall be agreed to between the Contractor and the COR prior to submission of the first invoice. All invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests. VA s Electronic Invoice Presentment and Payment System (IPPS) The VA Financial Services Center (FSC) uses a third-party contractor, Tungsten, to transition vendors from paper to electronic invoice submission. Please go to this website to begin submitting electronic invoices, free of charge: http://www.tungsten-network.com/US/en/veterans-affairs/. More information on the VA FSC is available at: http://www.fsc.va.gov/einvoice.asp. Vendor e-Invoice Set-Up Information: To begin submitting your electronic invoices to the VA FSC for payment processing, free of charge, please contact Tungsten at the below phone number or email address: Tungsten e-Invoice Setup Information: 1-877-489-6135 Tungsten e-Invoice Email: VA.Registration@Tungsten-Network.com If you have a question about the e-invoicing program or Tungsten, please contact the FSC at the below phone number email address. FSC e-Invoice Contact Information: 1-877-353-9791 FSC e-Invoice Email: vafsccshd@va.gov Contract Type. Firm-Fixed Priced Contract VA INFORMATION CUSTODIAL LANGUAGE. This entire section applies to all acquisitions requiring any Information Security and Privacy language. The Government shall receive unlimited rights to data/intellectual property first produced and delivered in the performance of this contract or order (hereinafter contract ) unless expressly stated otherwise in this contract. This includes all rights to source code and all documentation created in support thereof. The primary clause used to define Government and Contractor data rights is FAR 52.227-14 Rights in Data General. The primary clause used to define computer software license (not data/intellectual property first produced under this contractor or order) is FAR 52.227-19, Commercial Computer Software License. Information made available to the contractor by VA for the performance or administration of this contract will be used only for the purposes specified in the service agreement, SOW, PWS, PD, and/or contract. The contractor shall not use VA information in any other manner without prior written approval from a VA Contracting Officer (CO). The primary clause used to define Government and Contractor data rights is FAR 52.227-14 Rights in Data General. VA information will not be co-mingled with any other data on the contractor s information systems or media storage systems. The contractor shall ensure compliance with Federal and VA requirements related to data protection, data encryption, physical data segregation, logical data segregation, classification requirements and media sanitization. VA reserves the right to conduct scheduled or unscheduled audits, assessments, or investigations of contractor Information Technology (IT) resources to ensure information security is compliant with Federal and VA requirements. The contractor shall provide all necessary access to records (including electronic and documentary materials related to the contracts and subcontracts) and support (including access to contractor and subcontractor staff associated with the contract) to VA, VA's Office Inspector General (OIG), VA HANDBOOK 6500.6 April 22, 2024 APPENDIX C C-2 and/or Government Accountability Office (GAO) staff during periodic control assessments, audits, or investigations. The contractor may only use VA information within the terms of the contract and applicable Federal law, regulations, and VA policies. If new Federal information security laws, regulations or VA policies become applicable after execution of the contract, the parties agree to negotiate contract modification and adjustment necessary to implement the new laws, regulations, and/or policies. The contractor shall not make copies of VA information except as specifically authorized and necessary to perform the terms of the contract. If copies are made for restoration purposes, after the restoration is complete, the copies shall be destroyed in accordance with VA Directive 6500, VA Cybersecurity Program and VA Information Security Knowledge Service. If a Veterans Health Administration (VHA) contract is terminated for default or cause with a business associate, the related local Business Associate Agreement (BAA) shall also be terminated and actions taken in accordance with VHA Directive 1605.05, Business Associate Agreements. If there is an executed national BAA associated with the contract, VA will determine what actions are appropriate and notify the contactor. The contractor shall store and transmit VA sensitive information in an encrypted form, using VA-approved encryption tools which are, at a minimum, Federal Information Processing Standards (FIPS) 140-2, Security Requirements for Cryptographic Modules (or its successor) validated and in conformance with VA Information Security Knowledge Service requirements. The contractor shall transmit VA sensitive information using VA approved Transport Layer Security (TLS) configured with FIPS based cipher suites in conformance with National Institute of Standards and Technology (NIST) 800-52, Guidelines for the Selection, Configuration and Use of Transport Layer Security (TLS) Implementations. The contractor s firewall and web services security controls, as applicable, shall meet or exceed VA s minimum requirements. Except for uses and disclosures of VA information authorized by this contract for performance of the contract, the contractor may use and disclose VA information only in two situations: (i) in response to a qualifying order of a court of competent jurisdiction after notification to VA CO (ii) with written approval from the VA CO. The contractor shall refer all requests for, demands for production of or inquiries about, VA information and information systems to the VA CO for response. Notwithstanding the provision above, the contractor shall not release VA records protected by Title 38 U.S.C. § 5705, Confidentiality of medical quality assurance records and/or Title 38 U.S.C. § 7332, Confidentiality of certain medical records pertaining to drug addiction, sickle cell anemia, alcoholism or alcohol abuse or infection with Human Immunodeficiency Virus (HIV). If the contractor is in receipt of a court order or other requests for the above mentioned information, the contractor shall immediately refer such court order or other requests to the VA CO for response. Information made available to the contractor by VA for the performance or administration of this contract or information developed by the contractor in performance or administration of the contract will be protected and secured in accordance with VA Directive 6500 and Identity and Access Management (IAM) Security processes specified in the VA Information Security Knowledge Service. Any data destruction done on behalf of VA by a contractor shall be done in accordance with National Archives and Records Administration (NARA) requirements as outlined in VA Directive 6300, Records and Information Management, VA Handbook 6300.1, Records Management Procedures, and applicable VA Records Control Schedules. The contractor shall provide its plan for destruction of all VA data in its possession according to VA Directive 6500 and NIST 800-88, Guidelines for Media Sanitization prior to termination or completion of this contract. If directed by the COR/CO, the contractor shall return all Federal Records to VA for disposition. Any media, such as paper, magnetic tape, magnetic disks, solid state devices or optical discs that is used to store, process, or access VA information that cannot be destroyed shall be returned to VA. The contractor shall hold the appropriate material until otherwise directed by the Contracting Officer s Representative (COR) or CO. Items shall be returned securely via VA-approved methods. VA sensitive information must be transmitted utilizing VA-approved encryption tools which are validated under FIPS 140-2 (or its successor) and NIST 800-52. If mailed, the contractor shall send via a trackable method (USPS, UPS, FedEx, etc.) and immediately provide the COR/CO with the tracking information. Self-certification by the contractor that the data destruction requirements above have been met shall be sent to the COR/CO within 30 business days of termination of the contract. All electronic storage media (hard drives, optical disks, CDs, back-up tapes, etc.) used to store, process or access VA information will not be returned to the …
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.