Skip to content
Department of Transportation

San Luis Obispo (SBP) ATCT Roof Replacement

Solicitation: 00SBP
Notice ID: 25077f7f49824379bf9dcd042e84a067
TypeSolicitationNAICS 238160PSCY1BASet-AsideSBADepartmentDepartment of TransportationAgencyFederal Aviation AdministrationStateCAPostedApr 02, 2026, 12:00 AM UTCDueMay 04, 2026, 04:00 PM UTCCloses in 29 days

Solicitation from FEDERAL AVIATION ADMINISTRATION • TRANSPORTATION, DEPARTMENT OF. Place of performance: CA. Response deadline: May 04, 2026. Industry: NAICS 238160 • PSC Y1BA.

Market snapshot

Awarded-market signal for NAICS 238160 (last 12 months), benchmarked to sector 23.

12-month awarded value
$136,894,300
Sector total $36,993,509,708 • Share 0.4%
Live
Median
$11,859,000
P10–P90
$11,859,000$11,859,000
Volatility
Stable0%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
0.4%
share
Momentum (last 3 vs prior 3 buckets)
+920%($112,457,730)
Deal sizing
$11,859,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for CA
Live POP
Place of performance
San Luis Obispo, California • 93401 United States
State: CA
Contracting office
Fort Worth, TX • 76177 USA

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
CA20260001 (Rev 2)
Match signal: state matchOpen WD
Published Jan 23, 2026California • San Diego
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
+137 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 137 more rate previews.
Davis-BaconBest fitstate match
CA20260001 (Rev 2)
Open WD
Published Jan 23, 2026California • San Diego
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+136 more occupation rates in this WD
Davis-Baconstate match
CA20260026 (Rev 2)
Open WD
Published Jan 23, 2026California • San Bernardino
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+129 more occupation rates in this WD
Davis-Baconstate match
CA20260012 (Rev 2)
Open WD
Published Jan 23, 2026California • San Luis Obispo
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+128 more occupation rates in this WD
Davis-Baconstate match
CA20260024 (Rev 2)
Open WD
Published Jan 23, 2026California • Orange
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+127 more occupation rates in this WD

Point of Contact

Name
Rodgers Cox
Email
rodgers.l.cox@faa.gov
Phone
Not available

Agency & Office

Department
TRANSPORTATION, DEPARTMENT OF
Agency
FEDERAL AVIATION ADMINISTRATION
Subagency
697DCK REGIONAL ACQUISITIONS SVCS
Office
Not available
Contracting Office Address
Fort Worth, TX
76177 USA

More in NAICS 238160

Description

The Subcontractor shall furnish all labor, materials, equipment, supervision and all other services required to replace the roof at ATCT at SBP. Attached drawings are for reference only, Approximate quantities ATCT Cab roof 361 sq. ft.

The scope of work includes but not limited to:
•  Remove and dispose of existing roofing system from the SBP ATCT cab roof.
•  Provide and install roof hatch guardrail kit with self closing gate, galvanized finish. to meet code compliance.
•  Remove and replace all roof drains.
•  Remove and replace roof hatch
•  Remove and relocate grounding counterpoise from roof to parapet wall.
•  Remove debris and trash generated from work and dispose of the debris per local and state requirements, daily.
 

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.