Kenai Lake Work Center Storage and Security
Combined Synopsis Solicitation from FOREST SERVICE • AGRICULTURE, DEPARTMENT OF. Place of performance: AK. Response deadline: Apr 09, 2026. Industry: NAICS 236220 • PSC Y1JZ.
Market snapshot
Awarded-market signal for NAICS 236220 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 36 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS 236220
Description
Amendment 4: The purpose of this amendment is to provide Seward Electric's (electric utility) estimate to move the transformer at KLWC. The estimate is attached and titled C-4 Seward Electric Estimate.
Amendment 3: The purpose of this amendment is to provide the following:
1) Additional solicitation questions have been answered and added on the attached document titled C-3 QA 1240BJ26Q0003.
2) An updated drawing sheet C2.0 is attached titled C-2 Attachment 3-2 Updated Location and Drainage.
3) A geotechnical investigation is attached titled C-2 Attachment 8 Geotechnical Memo.
Note: Seward Electric is supposed to have pricing available to move the electrical equipment prior to March 31st.
Amendment 2: The purpose of this amendment is to extend the due date for quotes to 4/9/2026. The U.S. Forest Service is waiting for the design contractor to provide answers and possible updates, which is required because of solicitation questions. An additional amendment will be issued that will provide answers to all solicitation questions asked from interested parties.
Amendment 1: The purpose of this amendment is to provide answers to solicitation questions. The attached document titled C-3 QA 1240BJ26Q0003 provides answers to the initial six questions received.
Description - This is a combined synopsis/solicitation for the following commercial services:
Base Items: Pole Barn Building that includes: (1) grading the existing storage yard area for stormwater drainage improvements in the vicinity of the pole barn area; (2) Installation of all dry utilities to the new pole barn building; (3) and construction of the new pole barn building per the construction plans and specifications.
Option Item: Relocation of Seward Electric’s transformer as shown on Drawing E1.1 of the Pole Barn Plans.
Option Item: Installing the security fence and gates around the storage yard per the construction plans and specifications.
Period of performance: 4/21/2026 to 11/30/2027.
Project Location:
This project is located at the Kenai Lake Work Center (KLWC). The address is Mile 24 Seward Highway, Seward AK 99664, on the west side of the highway. The KLWC is located approximately 6 miles south of Moose Pass, Alaska, and approximately 23 miles north of Seward, Alaska.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.