Y--Glen Canyon Powerplant and Lake Powell Switchyard
Sources Sought from BUREAU OF RECLAMATION • INTERIOR, DEPARTMENT OF THE. Place of performance: {"city":{},"state":{},"country":{}}. Response deadline: May 01, 2026. Industry: NAICS 237130 • PSC Y1MD.
Market snapshot
Awarded-market signal for NAICS 237130 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
Point of Contact
Agency & Office
More in NAICS 237130
Description
Bureau of Reclamation – Upper Colorado Region
Glen Canyon Powerplant and Lake Powell Switchyard
NOTICE TYPE: Sources Sought (Market Research)
NAICS: 237130 – Power and Communication Line and Related Structures Construction
PSC: Y1MD Construction of Electrical Installations and Power Plants
1. NOTICE DESCRIPTION
This Sources Sought announcement is issued solely for market research and planning purposes in accordance with FAR Part 10.
This is NOT a solicitation, request for proposal, bid, or quote.
No contract will be awarded from this notice. No reimbursement will be provided for costs associated with responding.
Information received will be used to enhance acquisition planning for a future competitive requirement under FAR Parts 15 and 36.
2. PROJECT LOCATION
Glen Canyon Powerplant and Lake Powell Switchyard
Glen Canyon Dam
Coconino County, Arizona (approx. 2 miles northwest of Page, AZ)
3. PROJECT OVERVIEW
The Bureau of Reclamation anticipates a construction requirement to furnish and install three (3) outdoor, three-phase station service transformers and perform associated electrical, protection, and structural work.
4. PRINCIPAL COMPONENTS OF WORK
A. Transformer Removal and Replacement
Removal and disposal of two (2) existing station service transformers.
Furnishing, installing, and commissioning three (3) new transformers:
Two (2) transformers:
• 3phase outdoor stepdown
• 3.75/4.687 MVA (KxAN/KxAF), 55°C rise
• 60 Hz
• High side: 13.8 kV, 150 kV BIL
• Low side: 4.16 kV, 75 kV BIL
• 6.5% impedance on 3.75 MVA
• Tap changer: ±2.5%, 5%
• Insulating fluid: Natural ester
One (1) transformer:
• 3phase outdoor stepdown
• 3.75/4.687 MVA (KxAN/KxAF), 55°C rise
• 60 Hz
• High side: 25 kV, 150 kV BIL
• Low side: 4.16 kV, 75 kV BIL
• 6.5% impedance on 3.75 MVA
• Tap changer: ±2.5%, 5%
• Insulating fluid: Natural ester
B. Additional Electrical & Structural Modifications
• Install new neutral grounding resistors.
• Remove/replace nonsegregated bus on lowside of two transformers.
• Modify highside isolatedphase bus.
• Furnish and install one (1) interrupter switch.
• Remove two (2) existing transformer protection relays; install three (3) new relays.
• Install six (6) current transformers.
• Remove existing concrete containment; install three (3) new containment systems.
• Remove/install 5 kV cable through powerplant.
• Remove/install approx. 2,000 LF of 25 kV armored cable via tunnel and underground conduit.
• Install three (3) singlepole fused disconnect switches.
• Remove and replace three (3) surge arresters.
5. ESTIMATED MAGNITUDE OF CONSTRUCTION
Between $10,000,000 and $25,000,000
6. ANTICIPATED PERIOD OF PERFORMANCE
• Period of Performance: TBD
• Anticipated Contract Award: 2nd Quarter FY 2027
7. SUBMISSION REQUIREMENTS
Interested and capable firms are requested to submit the following:
Company Information
• Name, physical address, UEI, points of contact, phone, and email.
Business Size & SBA Program Status under NAICS 237130 and 335311
• Indicate Small Business, HUBZone, 8(a), SDVOSB, WOSB, SDB, or Large Business.
• SBA certification must be verifiable in SAM.gov.
Capabilities Statement
• Demonstrate relevant experience and capability to perform all required work.
Transformer Manufacturer Information
• Manufacturer name and country of origin.
• Documentation supporting compliance with FAR 52.2255 (Trade Agreements) and/or 52.22511 (Buy American – Construction Materials).
Estimated Transformer Lead Time
• Assume NTP = January 25, 2027 for market research purposes.
Market Conditions & Economic Price Adjustment Input
• Brief statement on anticipated supply chain volatility and whether an EPA clause is advisable.
Transformer Pricing Indices Used
• Identify indices commonly applied for transformers with these characteristics.
Bonding Capacity
• Provide aggregate and single project bonding limits.
8. RESPONSE DELIVERY
Email responses only to:
Lisa Laughbon
Contracting Officer
Email: lisa_laughbon@ios.doi.gov
Response Deadline: COB 5/1/2026
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.