- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
Bulkhead Slot Coring and Wiresawing for Pike Island Locks and Dam
Solicitation from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: WV. Response deadline: Jan 21, 2026. Industry: NAICS 238990 • PSC Z1KA.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Awarded-market signal for NAICS 238990 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 248 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS 238990
Description
The U.S. Army Corps of Engineers (USACE), Pittsburgh District, is carrying out a Project at Pike Island Locks and Dam, Ohio River, Belmont County, West Virginia. The work is located on both the Main Lock Chamber and the Auxiliary Lock Chamber, downstream of each of the downstream miter gates at the poiree dam location. The site of the work may be reached from state and local roads and streets, however, floating plant support may be required for some features of work. The general description of the work is to furnish all equipment, labor, layout of work, and supervision to prepare the site for future installation of downstream bulkhead recesses by others. This work includes coring holes in the concrete, wiresawing of concrete, on both the vertical and horizontal faces of the lock monoliths, to the extent shown in the plans. Portions of this work will occur underwater. Concrete coring work will be performed in the 110-FT by 1200-FT main lock chamber, and the 110-FT by 600 FT auxiliary lock chamber, specifically at the monoliths adjacent to the Poiree dam sill. The work will involve both vertical and horizontal coring of concrete. In addition to concrete coring, concrete wiresawing work will be performed in the 110-FT by 600-FT auxiliary lock chamber only, at the location where the concrete coring was executed. The work will involve both vertical and horizontal sawing of concrete. 6 January 2026 - Amendment 0001 posted to 1) update Attachment 4 - Wage Determination OH20250001 9-26-2025 to OH20260001 1-2-2-026, 2) update Attachment 5 - Wage Determination WV20250073 6-6-2026 to WV20260073 1-2-2026, 3) reopen ProjNet for questions from 6 January 2026 to close of business on 9 January 2026, and 4) extend the solicitation from 11:00 AM ET, 13 January 2026 to 11:00 AM ET, 16 January 2026. 15 January 2026 - Amendment 0002 posted to 1) update Section 00 45 00 to Attachment 1 - Specifications based upon ProjNet questions, 2) update Plan Sheet S-510 of Attachment 2 - Plans, 3) add Reference Drawing S-1001-Z to Attachment 2 - Plans, and 4) extend the solicitation from 11:00 AM ET, 16 January 2026 to 11:00AM ET, 21 January 2026. NOTE: Due to a system error in PIEE, this Solicitation did not transfer from a pre-solicitation to a solicitation. This issue has been resolved, and contractors can now submit their bids via PIEE. These updates prompted changes in SAM.gov that do not affect the solicitation and were necessary to synchronize SAM.gov to PIEE.
21 January 2026 - Bid opening held, bid results posted.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.