- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
Electric Replacement Components and Installation for Pump #5 at Big Creek Supplemental Pump Station, Polk City IA
Combined Synopsis Solicitation from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: IA. Response deadline: Mar 20, 2026. Industry: NAICS 423610 • PSC 5975.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 56 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS 423610
Description
The primary objective of this contract is for the contractor to supply and install the required components to restore the Schneider Electric Variable Frequency Drive (VFD) at the Big Creek Supplemental Pump Station to full operational status.
The scope of this work includes the procurement and supply of all necessary components and the on-site installation, configuration, testing, and commissioning of the repaired VFD to ensure it is fully operational and meets or exceeds original performance specifications.
This is a Firm-Fixed-Price acquisition. The Government will award a contract to the offerer whose offer is the lowest evaluated price. The offerer shall meet the requirements in this Scope of Work, including the mandatory use of Schneider Electric parts and certified technicians. See approved Justification and Approval (J&A) in the attachments section for reference labeled as, "A02 - J&A Scheider Electric VFD_Final.pdf"
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.