Skip to content
← Back to blog

NAICS 332510 in play: quick-quote hardware buys (DLA/Navy) plus a brand-name-or-equal racking RFQ (GSA)

Feb 08, 2026Jordan PatelSolicitation Intelligence Lead5 min readnaics compare
NAICS 332510DLANAVSUPGSARFQPSC 53MIL-STD-129brand name or equal
Opportunity snapshot
Hammerhead Rack System
GENERAL SERVICES ADMINISTRATIONFEDERAL ACQUISITION SERVICESet-aside: NONENAICS: 332510PSC: 5120
Posted
2026-02-06
Due
2026-02-10T22:00:00+00:00

Related opportunities

Executive takeaway

This is a classic NAICS 332510 week: several DLA/Navy hardware line items under PSC 53/5340 (some with small-business set-asides and NSN-driven delivery requirements), plus a separate GSA RFQ for a Hammerhead racking system as a brand-name-or-equal buy. The fastest path to award here is usually administrative perfection (submit everything the RFQ asks for) and supply-chain certainty (approved sources when called out, and delivery/marking compliance).

What the buyer is trying to do

The defense supply chain buyers (DLA and NAVSUP WSS) are replenishing specific, cataloged hardware items (e.g., padlocks, spacer sleeves, rivets, strapping, and an operating rod) tied to NSNs and destination distribution centers. These tend to reward vendors who can reliably source the exact item, meet required delivery timelines, and submit clean electronic quotes.

Separately, GSA’s Supply Chain Management Contracting Division is running an RFQ for a Hammerhead LLC racking system on a brand-name-or-equal basis, with CONUS delivery, FOB Destination pricing, and MIL-STD-129 marking/labeling.

What work is implied (bullets)

  • Read the RFQ/solicitation package online (hard copies are not available for the DLA RFQs noted).
  • Confirm the NSN/item requirements and quote the correct unit of issue and quantities (e.g., PADLOCK SET quantity 32; SPACER,SLEEVE quantity 546).
  • Plan logistics to the specified DLA distribution locations and required delivery timing (e.g., “By: XXXX days ADO” where stated).
  • Where the notice indicates an approved source (e.g., SPACER,SLEEVE lists approved source “72429 149C5044-2”), validate that you can supply from the approved source or that your alternate will be considered.
  • For the GSA racking system RFQ: prepare a brand-name-or-equal response that meets the salient characteristics in the RFQ, provide FOB Destination pricing, and include your best delivery lead time.
  • For the GSA RFQ: ensure shipments comply with MIL-STD-129 marking and labeling and complete/sign any required MIL-STD-129 form included with the RFQ.
  • Submit quotes electronically (explicitly required/allowed across several notices).

Who should bid / who should pass (bullets)

  • Bid if you routinely quote NSN-driven hardware for DLA/Navy and can meet “days ADO” delivery expectations to DLA distribution sites.
  • Bid if you can document sourcing for approved-source items (or already distribute the specified part number).
  • Bid if you can handle MIL-STD-129 marking/labeling and are comfortable with strict RFQ compliance gates (GSA racking system).
  • Pass if you cannot access the approved source called out for the spacer sleeve requirement and you don’t have a viable path for an alternate to be accepted.
  • Pass if you have weak internal controls for completing every required RFQ field/attachment—GSA explicitly warns that missing fields/docs can eliminate you from consideration.
  • Pass if your business cannot submit quotes electronically or cannot receive POs via EDI or an OMS vendor portal for the GSA buy.

Response package checklist (bullets; if unknown say “verify in attachments”)

  • Completed quote submission with the correct solicitation number and line-item pricing (verify in attachments for exact format).
  • Confirmation of delivery lead time / ability to meet the stated “days ADO” delivery requirement where provided.
  • Proof/statement of ability to submit electronically (explicitly required in multiple notices).
  • For GSA RFQ 47QSSC26Q0054: confirmation you are registered to receive Purchase Orders via EDI or through the OMS Vendor Portal.
  • For GSA RFQ 47QSSC26Q0054: brand-name-or-equal substantiation against salient characteristics (verify in attachments).
  • For GSA RFQ 47QSSC26Q0054: completed and signed MIL-STD-129 form (the notice states forms are attached).
  • For DLA NSN buys: any required sourcing documentation and compliance representations (verify in attachments).

Pricing & strategy notes (how to research pricing; do not invent pricing numbers)

Because these are largely RFQ-style supply actions, your pricing work should focus on defensible unit pricing, freight assumptions, and lead time realism:

  • Benchmark pricing by NSN/part number internally (prior quotes, distributor cost history) and validate current availability before you lock a delivery promise.
  • Account for FOB Destination where explicitly requested (GSA racking system). Ensure freight/packaging/handling are covered.
  • Lead time can be an evaluation lever: GSA requests the vendor’s best delivery lead time and uses a best-value approach after admin compliance.
  • Approved-source calls can constrain competition: for the spacer sleeve notice that lists an approved source/part number, confirm whether you are quoting that exact source/part to avoid price wasted on a non-acceptable offer.
  • Watch for indefinite delivery constructs: the DLA strapping notice mentions an Indefinite Delivery Contract with an estimated quantity and an NTE value; treat that as a different pricing posture than a one-time spot buy (review the full solicitation when available).

Subcontracting / teaming ideas (bullets)

  • Pair a small business quoter with an established OEM/authorized distributor to satisfy approved-source or part-number constraints on NSN items.
  • Use a logistics/packaging specialist to ensure MIL-STD-129 marking/labeling is consistently applied for the GSA racking system shipments.
  • For the GSA brand-name-or-equal requirement, team with the manufacturer/reseller best positioned to document equivalency to the salient characteristics in the RFQ (verify in attachments).

Risks & watch-outs (bullets)

  • Admin-compliance elimination (GSA): the racking system notice states missing required documents, blank required fields (including Section 3 questions), incomplete clauses/provisions, or an unsigned MIL-STD-129 form may remove you from consideration.
  • Approved source limitations: SPACER,SLEEVE calls out an approved source and a specific part number; ensure your quote aligns.
  • Short fuse on some closes: the GSA racking system closes quickly (response deadline is shown in the notice); plan internal review time accordingly.
  • Attachment-dependent requirements: several notices provide minimal public detail (“Description is not available” or “Specifications… are not available”), so your bid/no-bid should hinge on the RFQ package you pull from the link.
  • Destination delivery timing: DLA/Navy “days ADO” requirements are easy to underestimate—confirm production/ship windows before quoting.

Related opportunities

How to act on this

  1. Pull each solicitation package from the BidPulsar link and confirm due dates (some are not shown in the notice excerpt).
  2. For each line item, validate: exact NSN/part number, approved source (if any), delivery location, and “days ADO” schedule.
  3. Build a compliance-first submission plan (especially for the GSA RFQ pages/required fields and the MIL-STD-129 form).
  4. Quote with realistic lead times and FOB Destination where requested, then submit electronically before the close.

If you want a second set of eyes on go/no-go, compliance gaps, or quote strategy for these NAICS 332510 buys, engage Federal Bid Partners LLC to help you package a clean, on-time response.

Related posts