J--Heavy Equipment Repair and Maintenance
NC-ROANOKE RIV NWR-KUBOTA TRANSM REPAIR
Department of the Interior opportunities often flow through multiple subagencies and contracting offices, each with different templates and amendment behavior. Use this hub to keep that activity in one place before final submission checks on SAM.gov.
NC-ROANOKE RIV NWR-KUBOTA TRANSM REPAIR
NV-PAHRANAGAT NWR-WASH PAD CONSTRUCTION
THE WASHINGTON DEPARTMENT OF FISH AND WILDLIFE (WDFW) IS SEEKING AN 18’X8’ AIRBOAT WITH TANDEM AXLE TRAILER.
TX Balcones Canyonlands NWR - Mastication Project
MI-JORDAN RIV NFH-To replace 5 windows at the Jordan River National Fish Hatchery Quarters 1,2,3,4,5, in accordance with the terms of the attached Scope of Work.
SUPPLY/DELIVER Qty 260 TONS OF LIMESTONE/RIP RAP ROCKS FOR FWS WELAKA NWR.
This equipment is necessary to continue and expand sturgeon research conducted in Washington rivers, bays, and estuaries and along the Washington coast. These specific receivers and transponders communicate with our currently deployed or inventoried items.
GPS-collars for black-tailed deer that are compatible with Vectronic proximity sensors already deployed in the project study area.
The State extends this Request for Proposals to identify a strategic federal relations consultant to partner with the Washington Department of Fish and Wildlife, Recreation and Conservation Office, Governor’s Salmon Recovery Office, Puget Sound Partnership, and Washington State Conservation Commission referred to…
WDFW seeking bids for removal of two (2) current outboards, use for trade in credit, then provide and install replacement outboards
Contract for fleet card products and services for purchasing fuel, maintenance, and roadside assistance. Fuel purchases may include gasoline, diesel, biodiesel, marine, aviation, and propane. The fleet card may also be used for electric vehicle charging stations.
This RFQ seeks vendors to fabricate, deliver, and offload HDPE dock pontoons for the Sekiu Boating Access Project. The pontoons will serve as flotation components for WDFW’s seasonal docks and must meet all material, dimensional, and quality specifications within the agreed timeline.
WDFW is seeking a vendor to supply and deliver 4’x12’ micro mesh fiberglass grating with aqua grit top and stainless-steel E-11 clips for the Sekiu Floating Dock Project. Materials must meet specification and be delivered safely and on time.
WDFW is seeking a vendor to supply, deliver, and offload steel/stainless-steel components for the fabrication of eighteen floating docks at the Sekiu Boating Access Project. Materials must be cut to specified lengths or provided in stock sizes, meet all dimensional and tolerance…
WDFW is seeking a qualified vendor to fabricate, deliver, and offload two (2) rectangular fiberglass troughs for use in juvenile salmon rearing at its hatchery facilities. The troughs must meet detailed specifications for material, durability, and food-safe construction, ensuring a safe and…
The purpose of this Request for Bid (RFB) is to establish a contract for landscape maintenance services at the Washington Department of Fish and Wildlife (WDFW) Offices located at 7801 Phillips Road SW, Lakewood, WA 98498.
WDFW is seeking a qualified vendor to fabricate, deliver, and offload two (2) rectangular fiberglass troughs for use in juvenile salmon rearing at its hatchery facilities. The troughs must meet detailed specifications for material, durability, and food-safe construction, ensuring a safe and…
No near-term close dates are currently visible on this page. Frequent issuing offices include FWS SAT TEAM 3, FWS, IT SERVICES, FWS, SAT TEAM 2, and FWS, CONSTRUCTION A/E TEAM 3.
Browse common filters found across the opportunities listed on this page.