Skip to content
SAM WDOL Directory

Wage Determinations

Review SCA, DBA, and CBA wage determinations with location coverage, revisions, rates, and benefit references.

9,648 records • Page 62 of 402
DBA
4,106
SCA
1,404
CBA
4,138
Active
9,648
With Rates
5,486
With Benefits
1,404
How To Choose
DBA (Construction)
Use for construction, alteration, or repair labor tied to Davis-Bacon prevailing wage requirements.
SCA (Service Contracts)
Use for service contracts where labor categories map to service occupation codes and fringe benefit rules.
CBA (Union Terms)
Use when the solicitation references collective bargaining agreement terms for covered labor classes.
Published Jan 02, 2026
Texas • San Saba, Schleicher, Sterling
PLUMBER, Excludes HVAC Pipe Installation
$37.15 + $16.92 fringe
Boilermaker
$33.70 + $24.41 fringe
ASBESTOS WORKER/HEAT & FROST INSULATOR
$33.23 + $7.52 fringe
Published Jan 02, 2026
Alabama • Etowah
BOILERMAKER
$34.21 + $23.92 fringe
IRONWORKER, STRUCTURAL
$33.75 + $14.03 fringe
IRONWORKER, REINFORCING
$33.75 + $14.03 fringe
Published Jan 02, 2026
Virginia • Scott, Washington
POWER EQUIPMENT OPERATOR Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100 ft. above ground
$40.99 + $18.05 fringe
Cranes under 90 tons
$39.99 + $18.05 fringe
IRONWORKER, STRUCTURAL
$21.55 + $1.39 fringe
Published Jan 02, 2026
Arkansas • St Francis
OPERATOR: Crane
$25.21 + $0.00 fringe
OPERATOR: Mechanic
$22.42 + $0.00 fringe
IRONWORKER, STRUCTURAL
$20.95 + $9.26 fringe
Published Jan 02, 2026
New York • Oswego
ELEVATOR MECHANIC
$58.44 + $38.43 fringe
IRONWORKER, ORNAMENTAL
$42.63 + $53.70 fringe
IRONWORKER, STRUCTURAL
$35.75 + $30.80 fringe
Published Jan 02, 2026
Kansas • Reno
IRONWORKER, STRUCTURAL
$39.00 + $34.25 fringe
POWER EQUIPMENT OPERATOR (Drill Rig Caissons)
$38.83 + $20.80 fringe
ELECTRICIAN
$26.72 + $4.22 fringe
Published Jan 02, 2026
Massachusetts • Berkshire, Franklin, Hampden +1
DIVER
$78.11 + $35.47 fringe
DIVER TENDER
$61.70 + $35.47 fringe
REPAINT: Bridge
$56.76 + $31.85 fringe
Published Jan 02, 2026
Michigan • Calhoun
OPERATOR: Power Equipment GROUP 1
$48.98 + $25.25 fringe
GROUP 2
$45.68 + $25.25 fringe
GROUP 3
$44.00 + $25.25 fringe
Published Jan 02, 2026
Florida • Marion
of Group 3's rate
$37.01 + $16.85 fringe
ELECTRICIAN
$33.50 + $13.85 fringe
IRONWORKER, STRUCTURAL AND REINFORCING
$31.50 + $16.45 fringe
Published Jan 02, 2026
National
SHEET METAL WORKER (including HVAC duct installation) Buildings over 100,000 square feet
$32.60 + $15.52 fringe
Operating Engineer: Bulldozer
$28.32 + $13.45 fringe
Operating Engineers: Compactor and Loader
$28.32 + $13.45 fringe
Published Jan 02, 2026
New Jersey • Salem
Elevator mechanic
$71.85 + $38.43 fringe
Marble setter
$64.66 + $40.97 fringe
Sheet metal worker (Including HVAC Duct Installation)
$62.62 + $50.66 fringe
Published Jan 02, 2026
Ohio • Ashtabula
ELEVATOR MECHANIC
$57.33 + $38.43 fringe
PIPEFITTER (Excludes HVAC Pipe Installation)
$51.00 + $32.56 fringe
PIPEFITTER (HVAC Pipe Installation Only)
$49.17 + $28.55 fringe
Published Jan 02, 2026
Florida • Sarasota
ft boom
$39.01 + $16.85 fringe
Group 2 Lattice under 150 ton, 100 ton up to 250 ton hydro cranes
$38.01 + $16.85 fringe
IRONWORKER, REINFORCING AND STRUCTURAL
$35.25 + $17.32 fringe
Published Jan 02, 2026
Missouri • Jasper, McDonald, Newton
POWER EQUIPMENT OPERATOR: Backhoe/Excavator
$45.48 + $22.42 fringe
Roller
$45.48 + $22.42 fringe
PLUMBER
$36.38 + $15.72 fringe
Published Jan 02, 2026
Oklahoma • Payne
ELECTRICIAN
$41.40 + $17.25 fringe
PLUMBER (Excludes HVAC Pipe Installation)
$41.00 + $16.03 fringe
PIPEFITTER (HVAC Pipe Installation Only)
$41.00 + $16.03 fringe
Published Jan 02, 2026
Georgia • Stephens
OPERATOR: Crane
$21.35 + $4.08 fringe
OPERATOR: Piledriver
$20.34 + $2.86 fringe
OPERATOR: Grader/Blade
$19.05 + $0.00 fringe
Published Jan 02, 2026
Kansas • Hamilton
IRONWORKER, STRUCTURAL
$39.00 + $34.25 fringe
POWER EQUIPMENT OPERATOR (Drill Rig Caissons)
$38.83 + $20.80 fringe
ELECTRICIAN
$26.72 + $4.22 fringe
Published Jan 02, 2026
Kansas • Leavenworth
CARPENTER (Excludes Form Work)
$43.28 + $21.25 fringe
LINE CONSTRUCTION: Lineman
$41.52 + $17.56 fringe
POWER EQUIPMENT OPERATOR Broom/Sweeper
$40.17 + $22.29 fringe
Published Jan 02, 2026
Pennsylvania • Montgomery
PIPEFITTER (Including HVAC Pipe and HVAC Unit Installation)
$72.52 + $44.58 fringe
PIPEFITTER Mechanical Equipment Serviceman (HVAC Pipe and Unit Installation Only)
$72.52 + $44.58 fringe
ELEVATOR MECHANIC
$71.85 + $38.43 fringe
Not affiliated with the U.S. Government. Verify final wage determination applicability and full text on SAM.gov.