Skip to content
Davis-Bacon

MI20260012 (Rev 0)

Coverage: Michigan • Calhoun.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
ELECTRICIAN$18.00$7.44
OPERATOR: Power Equipment GROUP 1$48.98$25.25
GROUP 2$45.68$25.25
GROUP 3$44.00$25.25
IRONWORKER, STRUCTURAL$36.55$29.51
LABORER: Mason Tender - Cement/Concrete$27.21$13.45
PAINTER: Brush and Roller$21.75$11.94
PIPEFITTER (HVAC Pipe Installation Only)$31.35$22.90
ROOFER$33.98$18.51
SHEET METAL WORKER, Includes HVAC Duct and Unit Installation$32.00$10.73
CARPENTER$18.81$6.38
CEMENT MASON/CONCRETE FINISHER$19.27$5.85
LABORER: Common or General$16.87$5.46
LABORER: Landscape$9.64$2.81
LABORER: Pipelayer$17.95$5.46
OPERATOR: Backhoe/Excavator$19.94$5.46
OPERATOR: Bobcat/Skid Steer/Skid Loader$17.66$7.65
PLUMBER, Excludes HVAC Pipe Installation$26.17$7.55
TRUCK DRIVER: Dump Truck$17.00$5.71

Related Wage Determinations

View directory →