Davis-Bacon
AR20260140 (Rev 0)Published Jan 02, 2026
Arkansas • Hot Spring
OPERATOR: Paver (Asphalt, Aggregate, and Concrete)
$22.11 + $0.00 fringe
OPERATOR: Bobcat/Skid Steer/Skid Loader
$21.60 + $0.00 fringe
OPERATOR: Crane
$21.13 + $0.00 fringe
Review SCA, DBA, and CBA wage determinations with location coverage, revisions, rates, and benefit references.