Skip to content
SAM WDOL Directory

Wage Determinations

Review SCA, DBA, and CBA wage determinations with location coverage, revisions, rates, and benefit references.

222 records • Page 4 of 10
DBA
172
SCA
26
CBA
24
Active
222
With Rates
197
With Benefits
26
How To Choose
DBA (Construction)
Use for construction, alteration, or repair labor tied to Davis-Bacon prevailing wage requirements.
SCA (Service Contracts)
Use for service contracts where labor categories map to service occupation codes and fringe benefit rules.
CBA (Union Terms)
Use when the solicitation references collective bargaining agreement terms for covered labor classes.
Published Jan 02, 2026
Arkansas • Hot Spring
OPERATOR: Paver (Asphalt, Aggregate, and Concrete)
$22.11 + $0.00 fringe
OPERATOR: Bobcat/Skid Steer/Skid Loader
$21.60 + $0.00 fringe
OPERATOR: Crane
$21.13 + $0.00 fringe
Published Jan 02, 2026
Arkansas • Yell
POWER EQUIPMENT OPERATOR Crane
$34.25 + $15.00 fringe
MILLWRIGHT
$34.02 + $11.88 fringe
Forklift
$33.25 + $15.00 fringe
Published Jan 02, 2026
Arkansas • Mississippi
OPERATOR: Crane
$25.21 + $0.00 fringe
OPERATOR: Mechanic
$22.42 + $0.00 fringe
IRONWORKER, STRUCTURAL
$21.09 + $9.26 fringe
Published Jan 02, 2026
Arkansas • Cleburne
OPERATOR: Crane
$25.21 + $0.00 fringe
OPERATOR: Mechanic
$22.42 + $0.00 fringe
IRONWORKER, STRUCTURAL
$20.95 + $9.26 fringe
Published Jan 02, 2026
Arkansas • Boone, Johnson, Logan +5
OPERATOR: Crane
$25.60 + $0.00 fringe
OPERATOR: Grader/Blade
$22.68 + $0.00 fringe
OPERATOR: Backhoe/Excavator/Trackhoe
$20.77 + $0.00 fringe
Published Jan 02, 2026
Arkansas • Grant
SPRINKLER FITTER (Fire Sprinklers)
$32.00 + $24.24 fringe
BRICKLAYER
$20.00 + $0.00 fringe
OPERATOR: Asphalt Paver
$15.75 + $0.00 fringe
Published Jan 02, 2026
Arkansas • White
OPERATOR: Crane
$25.21 + $0.00 fringe
OPERATOR: Mechanic
$25.00 + $0.00 fringe
IRONWORKER, STRUCTURAL
$20.95 + $9.26 fringe
Published Jan 02, 2026
Arkansas • Lonoke
PLUMBER (Includes HVAC Pipe Installation)
$34.41 + $15.70 fringe
PIPEFITTER (Excludes HVAC Pipe Installation)
$34.41 + $15.70 fringe
BOILERMAKER
$34.21 + $23.92 fringe
Published Jan 02, 2026
Arkansas • Independence
POWER EQUIPMENT OPERATOR Crane
$34.25 + $15.00 fringe
Forklift
$33.25 + $15.00 fringe
IRONWORKER, STRUCTURAL
$28.00 + $21.21 fringe
Published Jan 02, 2026
Arkansas • Pulaski
PLUMBER (Includes HVAC Pipe Installation)
$34.41 + $15.70 fringe
PIPEFITTER (Excludes HVAC Pipe Installation)
$34.41 + $15.70 fringe
BOILERMAKER
$34.21 + $23.92 fringe
Published Jan 02, 2026
Arkansas • Calhoun, Clark, Columbia +10
OPERATOR: Bulldozer
$20.10 + $0.00 fringe
OPERATOR: Backhoe/Excavator/Trackhoe
$17.90 + $0.00 fringe
CARPENTER, Includes Form Work
$16.41 + $3.15 fringe
Published Jan 02, 2026
Arkansas • Yell
OPERATOR: Crane
$25.60 + $0.00 fringe
OPERATOR: Grader/Blade
$22.68 + $0.00 fringe
OPERATOR: Backhoe/Excavator/Trackhoe
$20.77 + $0.00 fringe
Published Jan 02, 2026
Arkansas • Craighead
PILEDRIVERMAN
$24.70 + $0.00 fringe
OPERATOR: Crane
$22.84 + $0.00 fringe
IRONWORKER, STRUCTURAL
$22.00 + $0.00 fringe
Published Jan 02, 2026
Arkansas • Lawrence
OPERATOR: Crane
$25.21 + $0.00 fringe
OPERATOR: Mechanic
$22.42 + $0.00 fringe
IRONWORKER, STRUCTURAL
$20.95 + $9.26 fringe
Published Jan 02, 2026
Arkansas • Cleveland
OPERATOR: Mechanic
$22.88 + $0.00 fringe
OPERATOR: Crane
$22.84 + $0.00 fringe
HIGHWAY/PARKING LOT STRIPING: Painter
$21.75 + $0.00 fringe
Published Jan 02, 2026
Arkansas • Crawford
PIPEFITTER
$34.41 + $15.70 fringe
BOILERMAKER
$34.21 + $23.92 fringe
SHEET METAL WORKER, Includes HVAC Duct Installation
$20.25 + $2.73 fringe
Published Jan 02, 2026
Arkansas • Crittenden
PIPEFITTER
$34.41 + $15.70 fringe
BOILERMAKER
$34.21 + $23.92 fringe
SHEET METAL WORKER (Includes HVAC Duct Installation)
$26.99 + $15.67 fringe
Published Jan 02, 2026
Arkansas • Johnson
CARPENTER, Includes Form Work
$17.32 + $3.15 fringe
OPERATOR: Backhoe/Excavator/Trackhoe
$17.22 + $0.94 fringe
OPERATOR: Bulldozer
$17.11 + $0.00 fringe
Published Jan 02, 2026
Arkansas • Pope
CARPENTER, Includes Form Work
$17.32 + $3.15 fringe
OPERATOR: Backhoe/Excavator/Trackhoe
$17.22 + $0.94 fringe
OPERATOR: Bulldozer
$17.11 + $0.00 fringe
Published Jan 02, 2026
Arkansas • Arkansas, Ashley, Bradley +4
OPERATOR: Bulldozer
$20.10 + $0.00 fringe
CARPENTER, Includes Form Work
$16.41 + $3.15 fringe
OPERATOR: Backhoe/Excavator/Trackhoe
$16.13 + $0.00 fringe
Published Jan 02, 2026
Arkansas • Faulkner
PIPEFITTER (Excludes HVAC Pipe Installation)
$34.41 + $15.70 fringe
BOILERMAKER
$34.21 + $23.92 fringe
MILLWRIGHT
$34.02 + $11.88 fringe
Published Jan 02, 2026
Arkansas • Sebastian
OPERATOR: Crane
$25.34 + $0.00 fringe
OPERATOR: Loader
$23.68 + $12.36 fringe
OPERATOR: Paver (Asphalt, Aggregate, and Concrete)
$21.54 + $0.00 fringe
Published Jan 02, 2026
Arkansas • Lafayette
BRICKLAYER
$17.60 + $0.00 fringe
ELECTRICIAN
$16.50 + $0.00 fringe
CARPENTER, Includes Cabinet Installation, and Drywall Finishing/Taping and Hanging
$14.89 + $0.00 fringe
Not affiliated with the U.S. Government. Verify final wage determination applicability and full text on SAM.gov.