Davis-Bacon
AR20260032 (Rev 0)
Coverage: Arkansas • Pulaski.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| BOILERMAKER | $34.21 | $23.92 |
| MILLWRIGHT | $34.02 | $11.88 |
| ELECTRICIAN (Includes Low Voltage Wiring) | $28.94 | $14.95 |
| PAINTER (Brush, Roller, and Spray, Excludes Drywall Finishing/Taping) | $16.25 | $10.42 |
| PLUMBER (Includes HVAC Pipe Installation) | $34.41 | $15.70 |
| PIPEFITTER (Excludes HVAC Pipe Installation) | $34.41 | $15.70 |
| SHEET METAL WORKER (Includes HVAC Duct Installation) | $26.99 | $15.67 |
| BRICKLAYER | $20.37 | $3.77 |
| CARPENTER, Includes Acoustical Ceiling Installation, and Drywall Hanging | $17.51 | $2.26 |
| CEMENT MASON/CONCRETE FINISHER | $19.91 | $3.30 |
| DRYWALL FINISHER/TAPER | $15.38 | $0.00 |
| INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation) | $17.16 | $4.76 |
| IRONWORKER, REINFORCING | $14.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $19.84 | $0.00 |
| LABORER: Common or General | $12.85 | $0.00 |
| LABORER: Mason Tender - Brick | $12.37 | $0.00 |
| LABORER: Pipelayer | $14.00 | $0.00 |
| OPERATOR: Backhoe/Excavator/Trackhoe | $28.21 | $0.00 |
| OPERATOR: Bulldozer | $16.74 | $0.00 |
| OPERATOR: Crane | $17.52 | $0.00 |
| OPERATOR: Grader/Blade | $14.66 | $0.00 |
| OPERATOR: Paver (Asphalt, Aggregate, and Concrete) | $23.75 | $0.00 |
| OPERATOR: Roller | $14.78 | $0.00 |
| ROOFER | $15.39 | $0.00 |
| SPRINKLER FITTER (Fire Sprinklers) | $23.56 | $2.77 |
| TRUCK DRIVER: Dump Truck | $13.80 | $0.71 |