Skip to content
SAM WDOL Directory

Wage Determinations

Review SCA, DBA, and CBA wage determinations with location coverage, revisions, rates, and benefit references.

222 records • Page 2 of 10
DBA
172
SCA
26
CBA
24
Active
222
With Rates
197
With Benefits
26
How To Choose
DBA (Construction)
Use for construction, alteration, or repair labor tied to Davis-Bacon prevailing wage requirements.
SCA (Service Contracts)
Use for service contracts where labor categories map to service occupation codes and fringe benefit rules.
CBA (Union Terms)
Use when the solicitation references collective bargaining agreement terms for covered labor classes.
Published Jan 02, 2026
Arkansas • Pope
POWER EQUIPMENT OPERATOR Crane
$34.25 + $15.00 fringe
MILLWRIGHT
$34.02 + $11.88 fringe
Forklift
$33.25 + $15.00 fringe
Published Jan 02, 2026
Arkansas • Van Buren
POWER EQUIPMENT OPERATOR Crane
$34.25 + $15.00 fringe
MILLWRIGHT
$34.02 + $11.88 fringe
Forklift
$33.25 + $15.00 fringe
Published Jan 02, 2026
Arkansas • White
POWER EQUIPMENT OPERATOR Crane
$34.25 + $15.00 fringe
Forklift
$33.25 + $15.00 fringe
ELECTRICIAN
$28.94 + $14.95 fringe
Published Jan 02, 2026
Arkansas • Clay, Cross, Fulton +1
POWER EQUIPMENT OPERATOR Crane
$34.25 + $15.00 fringe
Forklift
$33.25 + $15.00 fringe
IRONWORKER, STRUCTURAL
$28.00 + $21.21 fringe
Published Jan 02, 2026
Arkansas • Clay, Cross, Fulton +14
OPERATOR: Bulldozer
$20.60 + $0.00 fringe
OPERATOR: Backhoe/Excavator/Trackhoe
$18.27 + $2.50 fringe
CARPENTER, Includes Form Work
$17.32 + $3.15 fringe
Published Jan 02, 2026
Arkansas • Grant, Perry, Saline
OPERATOR: Crane
$24.21 + $6.79 fringe
ELECTRICIAN
$22.48 + $7.92 fringe
CARPENTER, Includes Form Work
$18.62 + $3.83 fringe
Published Jan 02, 2026
Arkansas • Benton
OPERATOR: Crane
$22.58 + $0.00 fringe
HIGHWAY/PARKING LOT STRIPING: Painter
$21.75 + $0.00 fringe
TRUCK DRIVER: Flatbed Truck
$21.03 + $0.00 fringe
Published Jan 02, 2026
Arkansas • Madison
OPERATOR: Crane
$24.21 + $6.79 fringe
ELECTRICIAN
$22.88 + $7.19 fringe
PAINTER (Brush and Roller)
$18.00 + $0.00 fringe
Published Jan 02, 2026
Arkansas • Calhoun
BRICKLAYER
$17.60 + $0.00 fringe
ELECTRICIAN
$16.50 + $0.00 fringe
CARPENTER, Includes Cabinet Installation, and Drywall Finishing/Taping and Hanging
$14.89 + $0.00 fringe
Published Jan 02, 2026
Arkansas • Chicot
BRICKLAYER
$17.60 + $0.00 fringe
ELECTRICIAN
$16.50 + $0.00 fringe
PLUMBER, Includes HVAC Pipe Installation
$13.25 + $0.00 fringe
Published Jan 02, 2026
Arkansas • Columbia
BRICKLAYER
$17.60 + $0.00 fringe
ELECTRICIAN
$16.50 + $0.00 fringe
CARPENTER, Includes Cabinet Installation, and Drywall Finishing/Taping and Hanging
$14.89 + $0.00 fringe
Published Jan 02, 2026
Arkansas • Logan, Marion
PLUMBER
$16.67 + $0.00 fringe
CEMENT MASON/CONCRETE FINISHER
$13.60 + $0.00 fringe
ELECTRICIAN
$13.35 + $0.00 fringe
Not affiliated with the U.S. Government. Verify final wage determination applicability and full text on SAM.gov.