Davis-Bacon
AR20260011 (Rev 0)
Coverage: Arkansas • Pope.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| MILLWRIGHT | $34.02 | $11.88 |
| ELECTRICIAN (Includes Low Voltage Wiring) | $28.94 | $14.95 |
| POWER EQUIPMENT OPERATOR Crane | $34.25 | $15.00 |
| Forklift | $33.25 | $15.00 |
| IRONWORKER, STRUCTURAL | $28.00 | $21.21 |
| PAINTER (Spray) | $16.25 | $10.42 |
| BRICKLAYER | $20.00 | $0.00 |
| CARPENTER, Includes Drywall Hanging, and Metal Stud Installation | $15.21 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $15.62 | $0.00 |
| HVAC MECHANIC: HVAC Duct Installation | $17.27 | $5.03 |
| LABORER: Common or General | $12.28 | $2.26 |
| LABORER: Mason Tender - Brick | $10.00 | $0.00 |
| OPERATOR: Backhoe/Excavator/Trackhoe | $23.08 | $0.00 |
| OPERATOR: Bulldozer | $18.14 | $0.00 |
| PAINTER (Brush and Roller) | $17.78 | $0.00 |
| PLUMBER | $14.54 | $1.08 |
| TRUCK DRIVER: Dump Truck | $15.00 | $0.00 |