Skip to content
SAM WDOL Directory

Wage Determinations

Review SCA, DBA, and CBA wage determinations with location coverage, revisions, rates, and benefit references.

9,648 records • Page 169 of 402
DBA
4,106
SCA
1,404
CBA
4,138
Active
9,648
With Rates
5,486
With Benefits
1,404
How To Choose
DBA (Construction)
Use for construction, alteration, or repair labor tied to Davis-Bacon prevailing wage requirements.
SCA (Service Contracts)
Use for service contracts where labor categories map to service occupation codes and fringe benefit rules.
CBA (Union Terms)
Use when the solicitation references collective bargaining agreement terms for covered labor classes.
Published Jan 02, 2026
Tennessee • Scott
Operating Engineers: Bulldozer and Crane
$33.23 + $13.40 fringe
ELECTRICIAN
$20.06 + $0.00 fringe
OPERATOR: Backhoe/Excavator/Trackhoe
$16.52 + $0.00 fringe
Published Jan 02, 2026
Virginia • Gloucester
POWER EQUIPMENT OPERATOR (Boat Operator)
$41.99 + $18.05 fringe
POWER EQUIPMENT OPERATOR (Crane)
$39.99 + $18.05 fringe
BOILERMAKER
$38.97 + $27.39 fringe
Published Jan 02, 2026
Tennessee • White
SHEET METAL WORKER
$37.70 + $17.40 fringe
POWER EQUIPMENT OPERATOR (Crane)
$36.25 + $13.40 fringe
POWER EQUIPMENT OPERATOR Backhoe/Trackhoe/Excavator
$33.23 + $13.40 fringe
Published Jan 02, 2026
Tennessee • Bedford, Coffee
SHEET METAL WORKER
$37.70 + $17.40 fringe
POWER EQUIPMENT OPERATOR (Crane)
$36.25 + $13.40 fringe
POWER EQUIPMENT OPERATOR Backhoe/Trackhoe/Excavator
$33.23 + $13.40 fringe
Published Jan 02, 2026
Vermont • Rutland
SHEET METAL WORKER (HVAC Duct Installation Only)
$36.75 + $18.63 fringe
IRONWORKER, REINFORCING
$33.65 + $26.12 fringe
CARPENTER (Includes Drywall Hanging and Metal Stud Installation)
$30.56 + $19.79 fringe
Published Jan 02, 2026
Oregon • Clackamas
GROUP 1B
$60.98 + $16.90 fringe
GROUP 1A
$58.82 + $16.90 fringe
POWER EQUIPMENT OPERATOR GROUP 1
$56.66 + $16.90 fringe
Published Jan 02, 2026
Tennessee • Knox
Operating Engineers: Bulldozer and Crane
$33.23 + $13.40 fringe
ELECTRICIAN
$32.45 + $15.25 fringe
Forklift
$30.44 + $13.40 fringe
Published Jan 02, 2026
Tennessee • Polk
ELECTRICIAN
$35.35 + $14.63 fringe
Operating Engineers: Bulldozer and Crane
$33.23 + $13.40 fringe
Forklift
$30.44 + $13.40 fringe
Published Jan 02, 2026
Vermont • Washington
SHEET METAL WORKER (HVAC Duct Installation Only)
$36.75 + $18.63 fringe
IRONWORKER, REINFORCING
$33.65 + $26.12 fringe
PLUMBER (HVAC Pipe Installation)
$25.35 + $5.79 fringe
Published Jan 02, 2026
Tennessee • Sumner
Electrician
$34.92 + $14.75 fringe
Operating Engineers: Bulldozer, Crane, and Forklift
$33.15 + $13.62 fringe
OPERATOR: Backhoe
$17.35 + $0.00 fringe
Published Jan 02, 2026
Vermont • Essex, Lamoille, Orange
SHEET METAL WORKER (HVAC Duct Installation Only)
$36.75 + $18.63 fringe
IRONWORKER, REINFORCING
$33.65 + $26.12 fringe
PLUMBER (HVAC Pipe Installation)
$25.35 + $5.79 fringe
Published Jan 02, 2026
Tennessee • Fentress, Hancock
SHEET METAL WORKER
$37.70 + $17.40 fringe
POWER EQUIPMENT OPERATOR (Crane)
$36.25 + $13.40 fringe
POWER EQUIPMENT OPERATOR Backhoe/Trackhoe/Excavator
$33.23 + $13.40 fringe
Published Jan 02, 2026
Tennessee • Jackson, Overton
SHEET METAL WORKER
$37.70 + $17.40 fringe
POWER EQUIPMENT OPERATOR (Crane)
$36.25 + $13.40 fringe
POWER EQUIPMENT OPERATOR Backhoe/Trackhoe/Excavator
$33.23 + $13.40 fringe
Published Jan 02, 2026
Tennessee • Monroe, Rhea
SHEET METAL WORKER
$37.70 + $17.40 fringe
POWER EQUIPMENT OPERATOR (Crane)
$36.25 + $13.40 fringe
POWER EQUIPMENT OPERATOR Backhoe/Trackhoe/Excavator
$33.23 + $13.40 fringe
Published Jan 02, 2026
Texas • Bastrop, Caldwell, Hays +2
ROOFER
$10.00 + $0.00 fringe
CEMENT MASON/CONCRETE FINISHER
$8.00 + $0.00 fringe
Sheet Rocker
$8.00 + $0.00 fringe
Published Jan 02, 2026
Texas • Johnson, Parker, Tarrant
TILE SETTER
$11.50 + $0.00 fringe
CEMENT MASON/CONCRETE FINISHER (Excluding form setting)
$9.48 + $0.00 fringe
Brush
$8.85 + $0.00 fringe
Published Jan 02, 2026
Texas • Denton
Plumbers and Pipefitters
$39.76 + $14.04 fringe
Electrician
$39.75 + $11.67 fringe
ASBESTOS WORKER/HEAT & FROST INSULATOR (Includes application of all insulating materials, protective coverings, coatings, and finishings to all types of mechanical systems)
$33.23 + $7.52 fringe
Published Jan 02, 2026
Texas • Nueces, San Patricio
ELECTRICIAN
$13.37 + $2.58 fringe
Power equipment operators: Backhoe
$9.21 + $0.00 fringe
CARPENTER (Excluding Form Setting)
$9.05 + $0.00 fringe
Published Jan 02, 2026
Texas • Bell, Coryell, Lampasas +2
Air Conditioning Mechanic
$9.06 + $0.00 fringe
PLUMBER
$7.89 + $0.00 fringe
CARPENTER
$7.87 + $0.00 fringe
Not affiliated with the U.S. Government. Verify final wage determination applicability and full text on SAM.gov.