Skip to content
Davis-Bacon

VT20260020 (Rev 0)

Coverage: Vermont • Rutland.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
CARPENTER (Includes Drywall Hanging and Metal Stud Installation)$30.56$19.79
IRONWORKER, REINFORCING$33.65$26.12
SHEET METAL WORKER (HVAC Duct Installation Only)$36.75$18.63
CARPENTER (Drywall Hanging Only)$23.00$5.94
CARPENTER, Excludes Acoustical Ceiling Installation, and Drywall Hanging$18.28$6.67
ELECTRICIAN$20.24$7.27
LABORER: Common or General$11.83$0.00
OPERATOR: Crane$19.50$6.08
PAINTER: Brush Only$16.11$4.14
PAINTER: Roller$16.11$4.14
PLUMBER (HVAC Pipe Installation)$25.35$5.79
PLUMBER, Excludes HVAC Pipe Installation$24.04$8.25
ROOFER$17.25$1.71
SPRINKLER FITTER (Fire Sprinklers)$27.48$7.24

Related Wage Determinations

View directory →