Skip to content
SAM WDOL Directory

Wage Determinations

Review SCA, DBA, and CBA wage determinations with location coverage, revisions, rates, and benefit references.

9,648 records • Page 152 of 402
DBA
4,106
SCA
1,404
CBA
4,138
Active
9,648
With Rates
5,486
With Benefits
1,404
How To Choose
DBA (Construction)
Use for construction, alteration, or repair labor tied to Davis-Bacon prevailing wage requirements.
SCA (Service Contracts)
Use for service contracts where labor categories map to service occupation codes and fringe benefit rules.
CBA (Union Terms)
Use when the solicitation references collective bargaining agreement terms for covered labor classes.
Published Jan 02, 2026
Minnesota • Hubbard
ELEVATOR CONSTRUCTORS
$53.28 + $41.79 fringe
HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INCLUDING JIB POWER EQUIPMENT OPERATOR: (Commercial Group 2)
$50.64 + $26.90 fringe
HEATING AND FROST INSULATORS
$50.51 + $23.45 fringe
Published Jan 02, 2026
Minnesota • Rock
ELEVATOR CONSTRUCTORS
$62.52 + $45.36 fringe
HEATING AND FROST INSULATORS
$57.24 + $31.95 fringe
Piledriver (INCLUDING VIBRATORY DRIVER OR EXTRACTOR FOR PILING AND SHEETING OPERATIONS)
$49.46 + $30.23 fringe
Published Jan 02, 2026
Mississippi • Carroll
ELECTRICIAN
$21.09 + $7.61 fringe
IRONWORKER (STRUCTURAL)
$21.00 + $8.81 fringe
IRONWORKER, REINFORCING
$18.50 + $0.00 fringe
Published Jan 02, 2026
North Carolina • Watauga
PIPEFITTER (Excluding HVAC System Installation)
$31.66 + $12.69 fringe
OPERATOR: Crane
$19.25 + $2.37 fringe
IRONWORKER, STRUCTURAL
$18.75 + $5.62 fringe
Published Jan 02, 2026
Tennessee • Davidson
ELEVATOR MECHANIC
$52.81 + $38.43 fringe
PLUMBER
$46.02 + $19.63 fringe
ASBESTOS WORKER/HEAT & FROST INSULATOR
$38.17 + $18.82 fringe
Published Jan 02, 2026
Ohio • Miami
ELEVATOR MECHANIC
$57.41 + $38.43 fringe
PIPEFITTER (Excludes HVAC Pipe Installation)
$51.00 + $32.56 fringe
SPRINKLER FITTER (Fire Sprinklers)
$48.28 + $28.08 fringe
Published Jan 02, 2026
Oregon • Douglas
HEAT & FROST INSULATOR
$62.02 + $22.36 fringe
PLUMBER
$60.77 + $34.72 fringe
SHEET METAL WORKER, Excludes HVAC Duct and Unit Installation
$54.99 + $33.92 fringe
Published Jan 02, 2026
Michigan • Monroe
OPERATOR: Power Equipment GROUP 1
$51.29 + $25.35 fringe
GROUP 2
$49.79 + $25.35 fringe
GROUP 3
$48.29 + $25.35 fringe
Published Jan 02, 2026
South Carolina • Berkeley, Dorchester
OPERATOR: Backhoe/Excavator/Trackhoe
$18.85 + $0.00 fringe
PLUMBER
$16.81 + $0.00 fringe
ELECTRICIAN
$16.55 + $0.00 fringe
Published Jan 02, 2026
Michigan • Muskegon
OPERATOR: Power Equipment Backhoe/Excavator; Bulldozer; Grader/Blade; Loader; Scraper
$41.28 + $25.25 fringe
PIPEFITTER (HVAC Pipe Installation Only)
$39.89 + $23.82 fringe
PLUMBER (Excluding HVAC Pipe Installation)
$37.09 + $22.52 fringe
Published Jan 02, 2026
Mississippi • Hancock
ELECTRICIAN
$27.16 + $7.45 fringe
OPERATOR: Crane
$22.66 + $4.66 fringe
IRONWORKER, REINFORCING
$20.63 + $0.00 fringe
Published Jan 02, 2026
Minnesota • St Louis
ELEVATOR CONSTRUCTORS
$62.52 + $45.36 fringe
POWER EQUIPMENT OPERATOR: (Commercial Group 1)
$51.03 + $26.90 fringe
HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INCLUDING JIB POWER EQUIPMENT OPERATOR: (Commercial Group 2)
$50.64 + $26.90 fringe
Published Jan 02, 2026
Tennessee • Coffee
Operating Engineers: Bulldozer and Crane
$33.23 + $13.40 fringe
ELECTRICIAN
$20.06 + $0.00 fringe
OPERATOR: Backhoe/Excavator/Trackhoe
$11.70 + $0.52 fringe
Published Jan 02, 2026
New York • Genesee
OPERATOR: Backhoe/Excavator/Trackhoe
$43.97 + $24.17 fringe
ELECTRICIAN (Includes Low Voltage Wiring)
$42.50 + $27.23 fringe
PIPEFITTER (Includes HVAC Pipe Installation)
$42.20 + $29.80 fringe
Published Jan 02, 2026
Mississippi • Alcorn, Calhoun, Chickasaw +14
IRONWORKER (STRUCTURAL)
$21.00 + $8.81 fringe
ELECTRICIAN
$19.36 + $7.70 fringe
IRONWORKER, REINFORCING
$18.50 + $0.00 fringe
Published Jan 02, 2026
North Carolina • Davie, Forsyth, Stokes +1
OPERATOR: Backhoe/Excavator/Trackhoe
$16.16 + $3.18 fringe
ELECTRICIAN
$15.41 + $3.13 fringe
OPERATOR: Loader
$15.13 + $2.79 fringe
Published Jan 02, 2026
Tennessee • Crockett
Operating Engineers: Bulldozer and Crane
$33.15 + $13.62 fringe
ELECTRICIAN
$20.06 + $0.00 fringe
OPERATOR: Backhoe/Excavator/Trackhoe
$16.76 + $0.00 fringe
Published Jan 02, 2026
Missouri • Camden, Cooper, Dent +7
SHEET METAL WORKER (Installation of HVAC Duct and HVAC System)
$52.00 + $27.12 fringe
Drywall Finishing/Taping
$34.90 + $17.21 fringe
Painters: Brush and Roller
$33.90 + $17.21 fringe
Published Jan 02, 2026
New York • Chautauqua
OPERATOR: Bobcat/Skid Steer/Skid Loader
$27.74 + $0.00 fringe
PLUMBER (Excludes HVAC Unit Installation)
$27.44 + $23.40 fringe
DRYWALL FINISHER/TAPER
$26.87 + $0.00 fringe
Not affiliated with the U.S. Government. Verify final wage determination applicability and full text on SAM.gov.