Davis-Bacon
MI20260018 (Rev 0)
Coverage: Michigan • Muskegon.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| OPERATOR: Power Equipment Backhoe/Excavator; Bulldozer; Grader/Blade; Loader; Scraper | $41.28 | $25.25 |
| IRONWORKER, STRUCTURAL | $36.55 | $29.51 |
| LABORER: Mason Tender - Cement/Concrete | $23.34 | $11.60 |
| PAINTER: Brush and Roller | $21.84 | $18.63 |
| PIPEFITTER (HVAC Pipe Installation Only) | $39.89 | $23.82 |
| PLUMBER (Excluding HVAC Pipe Installation) | $37.09 | $22.52 |
| ROOFER | $32.65 | $14.80 |
| SHEET METAL WORKER, Includes HVAC Duct and Unit Installation | $21.44 | $11.44 |
| CARPENTER | $17.71 | $5.58 |
| CEMENT MASON/CONCRETE FINISHER | $16.13 | $3.47 |
| ELECTRICIAN | $20.18 | $4.96 |
| LABORER: Common or General | $13.03 | $4.65 |
| LABORER: Landscape | $9.64 | $2.81 |
| LABORER: Pipelayer | $17.95 | $5.46 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader | $17.66 | $7.65 |
| OPERATOR: Crane | $18.50 | $5.10 |
| TRUCK DRIVER: Dump Truck | $17.00 | $5.71 |