Skip to content
SAM WDOL Directory

Wage Determinations

Review SCA, DBA, and CBA wage determinations with location coverage, revisions, rates, and benefit references.

9,648 records • Page 119 of 402
DBA
4,106
SCA
1,404
CBA
4,138
Active
9,648
With Rates
5,486
With Benefits
1,404
How To Choose
DBA (Construction)
Use for construction, alteration, or repair labor tied to Davis-Bacon prevailing wage requirements.
SCA (Service Contracts)
Use for service contracts where labor categories map to service occupation codes and fringe benefit rules.
CBA (Union Terms)
Use when the solicitation references collective bargaining agreement terms for covered labor classes.
Published Jan 02, 2026
Texas • Wilson
ELEVATOR MECHANIC
$51.59 + $38.43 fringe
POWER EQUIPMENT OPERATOR Cranes
$39.47 + $10.39 fringe
HVAC MECHANIC (Electrical Temperature Control Installation & Unit Installation Only)
$38.97 + $11.48 fringe
Published Jan 02, 2026
Texas • Red River
ASBESTOS WORKER/HEAT & FROST INSULATOR
$33.23 + $7.52 fringe
Boilermaker
$33.17 + $24.92 fringe
IRONWORKER (Reinforcing)
$29.64 + $8.43 fringe
Published Jan 02, 2026
New Jersey • Sussex
Electricians: Apartments over 4 units
$65.43 + $65.50 fringe
PLUMBER
$62.09 + $45.05 fringe
Power equipment operators: (1) Backhoe including Backhoe Track; Crane; Front End Loader 5 cu yd and over
$61.72 + $37.50 fringe
Published Jan 02, 2026
Utah • Sanpete
TRUCK DRIVER (Lowboy)
$32.69 + $14.65 fringe
TRUCK DRIVER (Oil Spreader)
$32.68 + $14.65 fringe
TRUCK DRIVER (Articulated)
$32.14 + $14.65 fringe
Published Jan 02, 2026
Indiana • Clay, Sullivan, Vermillion +1
POWER EQUIPMENT OPERATOR Backhoe/Excavator/Trackhoe
$49.05 + $43.40 fringe
Bobcat/Skid Steer/Skid Loader
$49.05 + $43.40 fringe
Bulldozer
$49.05 + $43.40 fringe
Published Jan 02, 2026
Kansas • Pratt
IRONWORKER, STRUCTURAL
$39.00 + $34.25 fringe
POWER EQUIPMENT OPERATOR (Drill Rig Caissons)
$38.83 + $20.80 fringe
ELECTRICIAN
$26.72 + $4.22 fringe
Published Jan 02, 2026
Kansas • Rice
IRONWORKER, STRUCTURAL
$39.00 + $34.25 fringe
POWER EQUIPMENT OPERATOR (Drill Rig Caissons)
$38.83 + $20.80 fringe
ELECTRICIAN
$26.72 + $4.22 fringe
Published Jan 02, 2026
Maine • Kennebec
POWER EQUIPMENT OPERATOR (Backhoe,Excavator, Loader, Trackhoe)
$43.25 + $33.45 fringe
POWER EQUIPMENT OPERATOR (Bulldozer)
$43.00 + $33.45 fringe
LABORER: Common or General
$25.40 + $21.28 fringe
Published Jan 02, 2026
Ohio • Delaware
ELEVATOR MECHANIC
$57.33 + $38.43 fringe
SPRINKLER FITTER (Fire Sprinklers)
$48.28 + $28.08 fringe
ELECTRICIAN (HVAC/Temperature Controls Installation Only)
$46.63 + $24.92 fringe
Published Jan 02, 2026
Colorado • Adams, Arapahoe, Boulder +9
Lineman and Welder
$61.46 + $24.25 fringe
PLUMBER
$50.68 + $20.15 fringe
ELECTRICIAN
$46.80 + $19.53 fringe
Published Jan 02, 2026
Minnesota • Swift
Brick/Block Mason
$7.25 + $0.00 fringe
CEMENT MASON/CONCRETE FINISHER
$7.25 + $0.00 fringe
LABORER
$7.25 + $0.00 fringe
Published Jan 02, 2026
Florida • Hardee
CARPENTER
$15.83 + $0.00 fringe
HVAC MECHANIC (Installation of HVAC Unit Only, Excludes Installation of HVAC Pipe and Duct)
$13.96 + $0.00 fringe
OPERATOR: Backhoe
$13.92 + $0.00 fringe
Published Jan 02, 2026
Kansas • Ottawa
IRONWORKER, STRUCTURAL
$39.00 + $34.25 fringe
ELECTRICIAN
$26.57 + $8.70 fringe
OPERATOR: Grader/Blade
$22.76 + $6.79 fringe
Published Jan 02, 2026
New Mexico • Bernalillo
PLUMBER
$22.84 + $7.33 fringe
Insulator Batt and Blown
$14.15 + $0.00 fringe
CEMENT MASON/CONCRETE FINISHER
$10.62 + $0.00 fringe
Published Jan 02, 2026
Virginia • Essex, Lancaster, Middlesex +3
OPERATOR: Crane
$26.68 + $0.00 fringe
OPERATOR: Grader/Blade, Includes Finishing
$26.13 + $0.00 fringe
CARPENTER, Includes Form Work
$21.73 + $3.06 fringe
Published Jan 02, 2026
Florida • Nassau
PLUMBER, Including HVAC Pipe Installation
$37.50 + $17.59 fringe
POWER EQUIPMENT OPERATOR: Crawler Crane, Hydro Crane, Locomotive Crane, Tower Crane, Truck Crane
$35.41 + $13.60 fringe
Gantry Crane, Bridge Crane
$35.41 + $13.60 fringe
Published Jan 02, 2026
Virginia • Giles
ELECTRICIAN, Includes Traffic Signalization
$36.85 + $17.18 fringe
IRONWORKER, STRUCTURAL
$27.38 + $0.00 fringe
OPERATOR: Grader/Blade
$26.13 + $0.00 fringe
Published Jan 02, 2026
Georgia • Fulton
SHEET METAL WORKER (including HVAC duct installation) Buildings over 100,000 square feet
$32.60 + $15.52 fringe
Operating Engineers: Backhoe, Compactor, and Loader
$28.32 + $13.45 fringe
Operating Engineer: Bulldozer
$28.32 + $13.45 fringe
Published Jan 02, 2026
Michigan • Cass
OPERATOR: Power Equipment GROUP 1
$48.98 + $25.25 fringe
ELECTRICIAN
$46.00 + $29.23 fringe
POWER EQUIPMENT OPERATOR GROUP 1
$45.98 + $25.25 fringe
Not affiliated with the U.S. Government. Verify final wage determination applicability and full text on SAM.gov.