| Occupation | Base | Fringe |
|---|---|---|
| Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems) | $36.98 | $16.82 |
| BRICKLAYER | $42.37 | $12.86 |
| BRICKLAYER | $32.93 | $14.29 |
| ELECTRICIAN | $35.40 | $16.06 |
| ELECTRICIAN | $46.80 | $19.53 |
| Line Construction: Groundman | $27.39 | $21.25 |
| Line Equipment Operator | $44.27 | $21.25 |
| Lineman and Welder | $61.46 | $24.25 |
| ELECTRICIAN | $31.75 | $13.25 |
| ELECTRICIAN | $40.70 | $18.47 |
| Power equipment operators: Blade: Finish | $34.58 | $15.20 |
| Blade: Rough | $34.05 | $15.20 |
| Bulldozer | $34.05 | $15.20 |
| Cranes: 50 tons and under | $34.77 | $15.20 |
| Cranes: 51 to 90 tons | $35.07 | $15.20 |
| Cranes: 91 to 140 tons | $36.27 | $15.20 |
| Cranes: 141 tons and over | $38.63 | $15.20 |
| Forklift | $34.58 | $15.20 |
| Mechanic | $35.58 | $15.20 |
| Oiler | $34.14 | $15.20 |
| Scraper: Single bowl under 40 cubic yards | $35.20 | $15.20 |
| Scraper: Single bowl, including pups 40 cubic yards and over and tandem bowls | $35.41 | $15.20 |
| Trackhoe | $35.20 | $15.20 |
| IRONWORKER, STRUCTURAL | $39.21 | $22.84 |
| Laborers: Pipelayer | $18.68 | $6.78 |
| PLUMBER | $50.68 | $20.15 |
| Plumbers and Pipefitters | $45.90 | $17.17 |
| Plumbers and Pipefitters | $41.32 | $16.01 |
| PIPEFITTER | $44.15 | $22.43 |
| Sheet metal worker | $43.05 | $22.65 |
| Truck drivers: Pickup | $26.96 | $4.87 |
| Tandem/Semi and Water | $27.59 | $4.87 |
| BOILERMAKER | $17.60 | $0.00 |
| Form Building and Setting | $16.97 | $2.74 |
| All Other Work | $15.14 | $3.37 |
| Cement Mason/Concrete Finisher | $17.31 | $2.85 |
| IRONWORKER, REINFORCING | $18.83 | $3.90 |
| Laborers: Common | $11.22 | $2.92 |
| Flagger | $8.91 | $3.80 |
| Landscape | $12.56 | $3.21 |
| Painters: Brush, Roller & Spray | $15.81 | $3.26 |
| Power equipment operators: Backhoe | $16.36 | $2.48 |
| Front End Loader | $17.24 | $3.23 |
| Skid Loader | $15.37 | $4.41 |
Related Wage Determinations
View directory →Davis-Bacon
CO20260001 (Rev 0)
Colorado • Alamosa, Archuleta, Baca +44
Davis-Bacon
CO20260007 (Rev 0)
Colorado • Boulder
Davis-Bacon
CO20260025 (Rev 0)
Colorado • Mesa
Davis-Bacon
CO20260024 (Rev 0)
Colorado • Larimer
Davis-Bacon
CO20260030 (Rev 0)
Colorado • Elbert, Gilpin
Davis-Bacon
CO20260026 (Rev 0)
Colorado • Park