Davis-Bacon
CO20260001 (Rev 0)
Coverage: Colorado • Alamosa, Archuleta, Baca +44.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems | $36.98 | $16.82 |
| Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems) | $36.60 | $11.83 |
| BRICKLAYER | $32.93 | $14.29 |
| BRICKLAYER | $42.37 | $15.21 |
| Carpenters: Formbuilding/Formsetting, Drywall Hanging/Framing and Metal Stud Work | $33.11 | $12.17 |
| CARPENTER Formbuilding/Formsetting, Drywall Hanging/Framing and Metal Stud Work | $33.11 | $12.17 |
| Electricians | $35.40 | $16.06 |
| ELECTRICIAN | $46.80 | $19.53 |
| ELECTRICIAN | $31.75 | $13.25 |
| ELECTRICIAN | $36.95 | $14.41 |
| ELECTRICIAN (Including low voltage wiring and installation of fire alarms, telephones, computers and temperature controls) | $40.70 | $18.47 |
| ELEVATOR MECHANIC | $56.57 | $38.43 |
| Ironworker, reinforcing and structural | $39.21 | $12.50 |
| LABORER Concrete/Mason Tenders | $21.10 | $7.89 |
| GLAZIER | $37.26 | $13.15 |
| CEMENT MASON/CONCRETE FINISHER | $34.73 | $15.15 |
| PLUMBER (Including HVAC Work) | $47.23 | $21.68 |
| PLUMBER/PIPEFITTER (Plumbers include HVAC work) (Pipefitters exclude HVAC work) | $47.60 | $18.10 |
| PLUMBER/PIPEFITTER PLUMBERS (Including HVAC work) & PIPEFITTERS (Excluding HVAC work) | $41.32 | $16.01 |
| PIPEFITTER (Excluding HVAC pipe) | $45.40 | $22.11 |
| Excluding HVAC work) | $43.40 | $22.11 |
| ROOFER | $32.90 | $6.18 |
| Sheet metal worker (Includes HVAC duct and installation of HVAC systems) | $43.05 | $22.65 |
| Carpenters: Acoustical | $15.69 | $3.15 |
| All other Work | $15.94 | $3.41 |
| Drywall Finisher/Taper | $14.44 | $2.19 |
| Laborer, common | $9.75 | $0.00 |
| Excluding drywall finishing/taping) Brush, Roller, Spray Power equipment operators | $13.41 | $0.00 |
Related Wage Determinations
View directory →Davis-Bacon
CO20260019 (Rev 0)
Colorado • Clear Creek
Davis-Bacon
CO20260012 (Rev 0)
Colorado • Alamosa, Archuleta, Chaffee +16
Davis-Bacon
CO20260024 (Rev 0)
Colorado • Larimer
Davis-Bacon
CO20260004 (Rev 0)
Colorado • Adams, Arapahoe, Boulder +9
Davis-Bacon
CO20260007 (Rev 0)
Colorado • Boulder
Davis-Bacon
CO20260003 (Rev 0)
Colorado • Alamosa, Archuleta, Baca +49