Davis-Bacon
WA20260127 (Rev 1)
Coverage: Washington • Pierce.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| BRICKLAYER | $55.34 | $20.05 |
| PILEDRIVER PERSON | $65.53 | $19.13 |
| CARPENTER, INCLUDES FORM WORK | $63.98 | $19.13 |
| ELECTRICIAN | $65.14 | $26.56 |
| LINE CONSTRUCTION: LINE PERSON | $64.17 | $24.54 |
| TREE TRIMMER: GROUND PERSON | $22.60 | $16.37 |
| TREE TRIMMER | $42.57 | $17.97 |
| LINE CONSTRUCTION: (CABLE SPLICER) | $64.17 | $24.77 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR | $55.19 | $20.94 |
| LINE CONSTRUCTION: (GROUND PERSON) | $37.53 | $17.74 |
| OPERATOR: BULLDOZER | $59.96 | $27.32 |
| OPERATOR: LOADER (OVERHEAD UNDER 6 YARDS; PLANT FEED) | $60.63 | $27.32 |
| OPERATOR: SCRAPER (SELF-PROPELLED UNDER 45 YARDS) | $60.63 | $27.32 |
| OPERATOR: OILER (TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER) | $59.96 | $27.32 |
| OPERATOR: OILER (DRILL OILERS: AUGER TYPE; TRUCK OR CRANE MOUNT; TRUCK CRANE OILER/DRIVER: UNDER 100 TONS) | $60.53 | $27.32 |
| OPERATOR: GRADER/BLADE | $61.41 | $27.32 |
| OPERATOR: DRILL (HORIZONTAL/DIRECTIONAL DRILL OPERATOR) | $60.63 | $27.32 |
| OPERATOR: DRILL (HORIZONTAL/DIRECTIONAL DRILL LOCATOR) | $59.96 | $27.32 |
| OPERATOR: DRILL (DRILLING MACHINE) | $62.32 | $27.32 |
| OPERATOR: CONCRETE PUMP (TRUCK MOUNT WITH BOOM ATTACHMENT UP TO 42M) | $60.63 | $27.32 |
| OPERATOR: CONCRETE PUMP (TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42M) | $61.41 | $27.32 |
| OPERATOR: CONCRETE PUMP (MOUNTED OR TRAILER HIGH PRESSURE LINE PUMP, PUMP HIGH PRESSURE) | $59.96 | $27.32 |
| IRONWORKER | $57.94 | $34.52 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $50.38 | $16.96 |
| LABORER: NOZZLE PERSON | $52.31 | $17.01 |
| LABORER: PIPELAYER | $51.52 | $16.99 |
| PAINTER | $41.24 | $14.70 |
| CEMENT MASON/CONCRETE FINISHER | $54.16 | $21.27 |
| PLUMBER | $60.72 | $34.15 |
| PIPEFITTER | $75.21 | $33.88 |
| SHEET METAL WORKER | $69.86 | $33.39 |
| TRUCK DRIVER: WATER TRUCK | $31.62 | $16.84 |
| TRUCK DRIVER: DUMP TRUCK | $26.75 | $8.37 |
| TRAFFIC CONTROL: FLAGGER | $27.79 | $11.03 |
| OPERATOR: SCREED | $49.96 | $9.66 |
| OPERATOR: ROLLER | $47.22 | $11.61 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $32.35 | $13.44 |
| OPERATOR: MILLING MACHINE | $48.95 | $10.33 |
| OPERATOR: MECHANIC | $37.11 | $19.20 |
| OPERATOR: FORKLIFT | $49.89 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $51.50 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $40.11 | $14.47 |
| MILLWRIGHT | $51.09 | $8.85 |
| LABORER: FENCE ERECTOR | $29.01 | $0.00 |
| LABORER: LANDSCAPE | $27.40 | $0.00 |
| LABORER: HOD CARRIER | $38.58 | $10.89 |
| LABORER: CONCRETE SAW CHAIN | $36.41 | $10.89 |
| LABORER: COMMON OR GENERAL | $33.86 | $9.48 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $42.89 | $5.01 |
| TRUCK DRIVER: ASPHALT MIX | $55.43 | $27.52 |
| GRADE CHECKER | $48.64 | $18.82 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $39.00 | $14.40 |
| OPERATOR: CRANE | $55.86 | $25.35 |
Related Wage Determinations
View directory →Davis-Bacon
WA20260027 (Rev 1)
Washington • Grays Harbor
Davis-Bacon
WA20260038 (Rev 1)
Washington • San Juan
Davis-Bacon
WA20260040 (Rev 1)
Washington • Wahkiakum
Davis-Bacon
WA20260045 (Rev 2)
Washington • Grant
Davis-Bacon
WA20260046 (Rev 1)
Washington • Grays Harbor
Davis-Bacon
WA20260049 (Rev 1)
Washington • Kittitas