Skip to content
Davis-Bacon

WA20260045 (Rev 2)

Coverage: Washington • Grant.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
CARPENTER (INCLUDING FORM WORK)$44.21$17.28
MILLWRIGHT$61.62$20.43
LINE CONSTRUCTION: LINEMEN$60.54$24.88
ELECTRICIAN$46.15$26.10
POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS AND OVER, AND ALL CLIMBING, OVERHEAD,RAIL AND TOWER); LOADERS (OVERHEAD AND FRONT-END, 10 YARDS AND OVER)$45.36$23.40
ENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER); CRANES (OVER 45 TONS TO BUT NOT INCLUDING 85 TONS); LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.); GRADER/BLADE$43.39$23.40
GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); CRANES (OVER 25 TONS, TO AND INCLUDING 45 TONS), BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC$43.05$23.40
POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UNDER 45,000 GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.); CRANES (25 TONS & UNDER); BOOM TRUCK (UNDER 25 TONS)$42.71$23.40
POWER EQUIPMENT OPERATOR: GROUP 4 LOADERS (OVERHEAD & FRONT-END, UNDER 4 YDS. R/T); OILER$42.51$23.40
POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6 OR EQUIVALENT)$42.31$23.40
POWER EQUIPMENT OPERATOR: GROUP 2 FORK LIFT$41.56$23.40
IRONWORKER (REINFORCING AND STRUCTURAL)$43.40$32.77
LABORER: A-2: GROUP 10 GRADE CHECKER$43.21$16.90
LABORER: A-2: GROUP 3 CEMENT/CONCRETE; PIPELAYER; CHIPPING GUNS$40.46$16.90
LABORER: A-2: GROUP 1 FLAGGER$37.03$16.90
LABORER, MASON TENDER BRICK$38.05$16.75
PAINTER (BRUSH, ROLLER, AND SPRAY.)$36.26$17.01
TRUCK DRIVER: 10 YARD TRUCK$24.61$8.34
TRUCK DRIVER: WATER TRUCK$24.36$8.30
TRUCK DRIVER: DUMP TRUCK$19.67$0.00
PIPEFITTER$25.98$3.98
OPERATOR: DRILL$28.15$8.20
LABORER: LANDSCAPE$14.67$0.00
LABORER: COMMON OR GENERAL$22.68$0.00
CEMENT MASON/CONCRETE FINISHER$17.21$0.00

Related Wage Determinations

View directory →