Davis-Bacon
WA20260123 (Rev 1)
Coverage: Washington • Cowlitz.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| LINE CONSTRUCTION: LINE PERSON | $64.17 | $24.54 |
| TREE TRIMMER: GROUND PERSON | $22.60 | $16.37 |
| TREE TRIMMER | $42.57 | $17.97 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR | $55.19 | $20.94 |
| ELECTRICIAN | $60.00 | $27.78 |
| E, ROBOTIC, TRACK AND WHEEL TYPE UP TO AND INCLUDING TWENTY THOUSAND (20,000) LBS. WITH ANY ATTACHMENTS; EXCAVATOR OPERATOR OVER TWENTY THOUSAND (20,000) LBS. THROUGH EIGHTY-FIVE THOUSAND (85,000) LBS) | $52.55 | $17.15 |
| OPERATOR: CONCRETE PUMP | $51.31 | $17.15 |
| OPERATOR: LOADER (LOADERS, RUBBER-TIRED TYPE, LESS THAN TWENTY-FIVE THOUSAND (25,000) LBS.) | $51.31 | $17.15 |
| OPERATOR: LOADER (LOADER OPERATOR, FRONT END AND OVERHEAD, TWENTY-FIVE THOUSAND (25,000) LBS. AND LESS THAN SIXTY THOUSAND (60,000) LBS.) | $52.55 | $17.15 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $52.55 | $17.15 |
| OPERATOR: ROLLER | $51.31 | $17.15 |
| OPERATOR: SCREED | $52.55 | $17.15 |
| OPERATOR: SCRAPER (SELF-PROPELLED UNDER 45 YARDS) | $52.55 | $17.15 |
| OPERATOR: OILER (TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER) | $51.31 | $17.15 |
| OPERATOR: OILER (DRILL OILERS: AUGER TYPE; TRUCK OR CRANE MOUNT; TRUCK CRANE OILER/DRIVER: UNDER 100 TONS) | $48.09 | $17.15 |
| OPERATOR: MECHANIC | $52.55 | $17.15 |
| OPERATOR: DRILL (DRILLING MACHINE; DIRECTIONAL DRILL OVE 20,000 LBS.) | $52.55 | $17.15 |
| OPERATOR: DRILL (DIRECTIONAL DRILL LOCATOR) | $48.09 | $17.15 |
| OPERATOR: DRILL (DIRECTIONAL DRILL LESS THAN 20,000 LBS.) | $51.31 | $17.15 |
| OPERATOR: BULLDOZER (OVER 70,000 LBS. UP TO AND INCLUDING 120,000 LBS.) | $55.88 | $17.15 |
| LABORER: NOZZLE PERSON | $52.31 | $17.01 |
| LABORER: COMMON OR GENERAL | $44.06 | $15.60 |
| PAINTER | $41.24 | $14.70 |
| TRUCK DRIVER: WATER TRUCK | $31.62 | $16.84 |
| TRUCK DRIVER: DUMP TRUCK | $34.13 | $15.63 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $30.61 | $10.89 |
| TRAFFIC CONTROL: FLAGGER | $27.75 | $11.15 |
| OPERATOR: GRADER/BLADE | $40.28 | $16.17 |
| OPERATOR: FORKLIFT | $45.93 | $19.20 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $43.60 | $0.00 |
| LABORER: FENCE ERECTOR | $30.21 | $0.00 |
| LABORER: PIPELAYER | $30.38 | $10.69 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $38.46 | $0.00 |
| LABORER: HOD CARRIER | $35.06 | $10.94 |
| LABORER: CONCRETE SAW CHAIN | $37.30 | $4.30 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $37.63 | $11.25 |
| IRONWORKER | $43.29 | $25.63 |
| GRADE CHECKER | $37.54 | $0.00 |
| FORM WORKER | $37.16 | $14.74 |
| CEMENT MASON/CONCRETE FINISHER | $39.33 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK | $29.72 | $0.00 |
| TRUCK DRIVER: ASPHALT MIX | $55.43 | $27.52 |
| OPERATOR: CRANE | $54.11 | $18.14 |
Related Wage Determinations
View directory →Davis-Bacon
WA20260027 (Rev 1)
Washington • Grays Harbor
Davis-Bacon
WA20260038 (Rev 1)
Washington • San Juan
Davis-Bacon
WA20260040 (Rev 1)
Washington • Wahkiakum
Davis-Bacon
WA20260045 (Rev 2)
Washington • Grant
Davis-Bacon
WA20260046 (Rev 1)
Washington • Grays Harbor
Davis-Bacon
WA20260049 (Rev 1)
Washington • Kittitas