Davis-Bacon
UT20260109 (Rev 0)
Coverage: Utah • Utah.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| CARPENTER (Excludes Form Work) | $32.17 | $17.50 |
| POWER EQUIPMENT OPERATOR Grader/Blade | $31.99 | $17.64 |
| Oiler | $31.99 | $17.64 |
| CARPENTER (Form Work Only) | $22.59 | $5.41 |
| CEMENT MASON/CONCRETE FINISHER | $20.59 | $2.41 |
| ELECTRICIAN, Includes Low Voltage Wiring | $27.45 | $2.30 |
| FENCE ERECTOR | $15.16 | $2.53 |
| HIGHWAY/PARKING LOT STRIPING: Painter | $17.78 | $2.53 |
| INSTALLER - GUARDRAIL | $14.80 | $2.66 |
| INSTALLER - SIGN | $14.76 | $2.53 |
| IRONWORKER, REINFORCING | $26.61 | $13.76 |
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor | $24.09 | $5.66 |
| LABORER: Common or General | $20.15 | $7.28 |
| LABORER: Landscape | $15.40 | $2.53 |
| LABORER: Mason Tender - Cement/Concrete | $13.46 | $2.64 |
| LABORER: Pipelayer | $17.23 | $2.79 |
| OPERATOR: Backhoe/Excavator/Trackhoe | $22.23 | $5.64 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader | $23.97 | $10.06 |
| OPERATOR: Broom/Sweeper | $22.54 | $10.36 |
| OPERATOR: Concrete Finishing Machine | $20.03 | $6.55 |
| OPERATOR: Crane | $30.66 | $10.61 |
| OPERATOR: Drill | $27.44 | $15.65 |
| OPERATOR: Loader | $24.85 | $12.74 |
| OPERATOR: Mechanic | $27.17 | $13.86 |
| OPERATOR: Milling Machine | $25.37 | $15.65 |
| OPERATOR: Paver (Asphalt, Aggregate, and Concrete) | $26.91 | $12.75 |
| OPERATOR: Roller | $24.58 | $13.62 |
| OPERATOR: Screed | $24.16 | $12.16 |
| OPERATOR: Pavement Marking Grinder | $27.95 | $7.05 |
| TRAFFIC CONTROL: Flagger | $12.58 | $1.75 |
| TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper | $20.59 | $8.65 |
| TRUCK DRIVER: Dump Truck | $24.41 | $12.16 |
| TRUCK DRIVER: Oil Distributor Truck | $26.17 | $11.27 |
| TRUCK DRIVER: Vactor | $23.40 | $0.00 |
| TRUCK DRIVER: Water Truck | $24.41 | $11.75 |