Davis-Bacon
UT20260105 (Rev 0)
Coverage: Utah • Cache.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| CARPENTER, Includes Form Work | $21.87 | $2.80 |
| CEMENT MASON/CONCRETE FINISHER | $20.24 | $6.20 |
| HIGHWAY/PARKING LOT STRIPING: Painter | $19.52 | $1.62 |
| IRONWORKER, REINFORCING | $26.61 | $13.76 |
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor | $22.08 | $8.65 |
| LABORER: Common or General | $17.51 | $5.84 |
| LABORER: Mason Tender - Cement/Concrete | $15.77 | $4.08 |
| LABORER: Pipelayer | $16.67 | $3.54 |
| OPERATOR: Backhoe/Excavator/Trackhoe | $20.04 | $7.27 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader | $18.43 | $3.31 |
| OPERATOR: Broom/Sweeper | $22.12 | $8.72 |
| OPERATOR: Concrete Finishing Machine | $20.03 | $6.55 |
| OPERATOR: Crane | $30.66 | $10.61 |
| OPERATOR: Drill | $27.44 | $15.65 |
| OPERATOR: Grader/Blade | $26.43 | $11.60 |
| OPERATOR: Loader | $22.63 | $11.88 |
| OPERATOR: Mechanic | $31.00 | $15.65 |
| OPERATOR: Milling Machine | $20.68 | $6.84 |
| OPERATOR: Oiler | $22.18 | $9.73 |
| OPERATOR: Paver (Asphalt, Aggregate, and Concrete) | $25.63 | $10.53 |
| OPERATOR: Roller | $22.67 | $9.13 |
| OPERATOR: Screed | $21.34 | $9.59 |
| OPERATOR: Pavement Marking Grinder | $24.37 | $15.65 |
| TRAFFIC CONTROL: Flagger | $20.59 | $8.65 |
| TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper | $20.59 | $8.65 |
| TRUCK DRIVER: Dump Truck | $24.77 | $12.40 |
| TRUCK DRIVER: Vactor | $23.40 | $0.00 |
| TRUCK DRIVER: Water Truck | $23.26 | $11.47 |