Skip to content
Davis-Bacon

OH20260029 (Rev 0)

Coverage: Ohio • Lake, Medina.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
BRICKLAYER$34.04$7.88
POWER EQUIPMENT OPERATOR (Bulldozer, Backhoe/Excavator)$39.46$15.15
POWER EQUIPMENT OPERATOR Crane$36.92$24.01
LABORER (Mason Tender-Brick)$25.90$18.40
PAINTER (Brush and Roller)$33.95$20.20
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$22.78$13.06
SHEET METAL WORKER$18.85$10.56
CARPENTER$18.23$7.67
CEMENT MASON/CONCRETE FINISHER$27.04$0.00
LABORER: Common or General$16.50$2.65
OPERATOR: Bobcat/Skid Steer/Skid Loader$29.49$11.16
PLUMBER$20.00$5.52
ROOFER$16.85$3.83

Related Wage Determinations

View directory →