Davis-Bacon
NV20260049 (Rev 1)
Coverage: Nevada • Lander.
Published: Jan 30, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| OPERATOR: Asphalt/Concrete Laydown | $60.39 | $30.38 |
| OPERATOR: Bulldozer | $60.39 | $30.38 |
| OPERATOR: Grader/Blade | $50.47 | $30.38 |
| OPERATOR: Loader Loader over 4 cu.yds. up to and including 12 cu.yds | $50.71 | $30.38 |
| OPERATOR: Mechanic | $50.28 | $30.38 |
| OPERATOR: Roller | $60.39 | $30.38 |
| OPERATOR: Oiler | $63.57 | $36.40 |
| IRONWORKER, REINFORCING | $50.70 | $35.15 |
| LABORER: Mason Tender - Cement/Concrete | $34.20 | $16.30 |
| LABORER: Jackhammer | $34.20 | $16.30 |
| LABORER: Common or General | $33.95 | $16.30 |
| LABORER: Concrete Saw | $34.20 | $16.30 |
| TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper | $36.70 | $16.30 |
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor | $34.45 | $16.30 |
| LABORER: Pipelayer | $34.45 | $16.30 |
| TRAFFIC CONTROL: Flagger | $32.08 | $16.30 |
| CEMENT MASON/CONCRETE FINISHER | $36.64 | $15.45 |
| OPERATOR: Backhoe/Excavator/Trackhoe | $45.10 | $23.79 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader | $39.05 | $23.76 |
| OPERATOR: Broom/Sweeper | $44.42 | $19.21 |
| OPERATOR: Drill | $46.92 | $25.02 |
| OPERATOR: Milling Machine | $55.93 | $15.47 |
| OPERATOR: Paver (Asphalt, Aggregate, and Concrete) | $40.99 | $26.97 |
| OPERATOR: Screed | $43.24 | $25.09 |
| TRUCK DRIVER: Dump Truck | $40.52 | $0.00 |
| TRUCK DRIVER: Water Truck | $42.48 | $0.00 |