Davis-Bacon
NV20260026 (Rev 1)
Coverage: Nevada • Washoe.
Published: Jan 30, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| CARPENTER (Includes Form Work) | $46.50 | $17.92 |
| ELECTRICIAN | $48.50 | $23.04 |
| POWER EQUIPMENT OPERATOR GROUP 08 | $49.61 | $30.38 |
| GROUP 10 | $50.28 | $30.38 |
| GROUP 10A | $42.72 | $24.50 |
| GROUP 11 | $50.71 | $30.38 |
| GROUP 11A | $52.35 | $30.38 |
| POWER EQUIPMENT OPERATOR (09) Mechanic and Backhoe Loader Combo | $49.93 | $30.38 |
| POWER EQUIPMENT OPERATOR (Crane) GROUP 12 | $65.99 | $36.40 |
| GROUP 16 | $67.41 | $36.40 |
| GROUP 17 | $67.91 | $36.40 |
| GROUP 19 | $69.94 | $36.40 |
| GROUP 20 | $70.55 | $36.40 |
| GROUP 21 | $71.16 | $36.40 |
| GROUP 22 | $71.92 | $36.40 |
| GROUP 23 | $72.38 | $36.40 |
| POWER EQUIPMENT OPERATOR GROUP 1 | $60.84 | $36.40 |
| GROUP 4 | $63.57 | $36.40 |
| GROUP 8 | $63.90 | $36.40 |
| GROUP 12 | $64.19 | $36.40 |
| IRONWORKER, REINFORCING | $50.70 | $35.15 |
| IRONWORKER, STRUCTURAL | $46.20 | $34.30 |
| LABORER (1) Common or General; Cones/ Barricades/ Barrels- Setter/Mover/Sweeper | $33.95 | $16.30 |
| A) Flagger | $32.08 | $16.30 |
| Asphalt Shoveler, Spreader and Distributor; Concrete Saw (Hand Held/Walk Behind); Mason Tender - Cement/Concrete; | $34.20 | $16.30 |
| Asphalt Raker; Pipelayer | $34.45 | $16.30 |
| CEMENT MASON/CONCRETE FINISHER | $43.06 | $13.69 |
| OPERATOR: Backhoe/Excavator/Trackhoe | $32.26 | $17.65 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader | $34.97 | $0.00 |
| OPERATOR: Broom/Sweeper | $36.66 | $12.22 |
| OPERATOR: Grader/Blade | $26.49 | $7.78 |
| OPERATOR: Loader | $33.53 | $17.10 |
| OPERATOR: Paver (Asphalt, Aggregate, and Concrete) | $29.57 | $0.00 |
| OPERATOR: Roller | $33.69 | $12.22 |
| TRUCK DRIVER: Dump Truck | $22.28 | $0.00 |